DEUTSCHE BAHN AGBESCHAFFUNG INFRASTRUKTUR FS.EI-SW-ADIE TEILNAHMEANTRÄGE KÖNNEN AUCH AN FOLGENDE E-MAILADRESSE GESENDET WERDEN CHRISTIAN.VOLENTER@DEUTSCHEBAHN.COM has floated a tender for 19fei37501 ch - pfa 9.3 wiesekorridor lph 4-7. The project location is Andorra and the tender is closing on 24 Apr 2019. The tender notice number is 1061299, while the TOT Ref Number is 31330630. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Andorra

Summary : 19fei37501 ch - pfa 9.3 wiesekorridor lph 4-7

Deadline : 24 Apr 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 31330630

Document Ref. No. : 1061299

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : DEUTSCHE BAHN AGBESCHAFFUNG INFRASTRUKTUR FS.EI-SW-ADIE TEILNAHMEANTRÄGE KÖNNEN AUCH AN FOLGENDE E-MAILADRESSE GESENDET WERDEN CHRISTIAN.VOLENTER@DEUTSCHEBAHN.COM
Bedarfsstelle/Vergabestelle Deutsche Bahn AG Beschaffung Infrastruktur FS.EI-SW-A Beschaffungsstelle/Organisator Deutsche Bahn AG Beschaffung Infrastruktur FS.EI-SW-A Die Teilnahmeanträge können auch an folgende
Andorra
Email :christian.volenter@deutschebahn.com

Tender Details

19fei37501 ch - pfa 9.3 wiesekorridor lph 4-7
length of the structure: 154.50 m. Height of the structure: so approx. 10 m above normal water level of the meadow. The building consists of 6 fields with fixed storage in the middle of the bridge (v double pillar). The track distance (double-track main line) is min 4.75 m.width of the structure: 12.68 m.on the west-facing bridge cap is a sound barrier in length of the bridge tothe tracks on the bridge run from about mid-bridge towards basel in a continuous radius. The superstructure on the bridge is conventional ballast superstructure with concrete sleepers. The railway line is electrified; it must be considered overhead line masts / earthing concepts on the building. The distance of the line is max. 80 km / h. Next dem river meadow is the freiburger strasse in the north and a foot and bike path south of the wieseueberspannt.die bridge has a massive and a high set abutment.lastbild uic 71.semi-integrale construction with resulting slim pillars and elimination of schienenauszuegen, thereby separate uig's required. New fasanenstrasse: wib.2 stuetzwaende, 2.6 place of realization 79098, freiburg 2.7 division into lots no 2.8 are variants allowed no 2.9 are partial offers allowed no 2.10 realization date beginning 01.05.2019 and end 31.12.2019 third

Documents

 Tender Notice