Procurement Summary
Country : Philippines
Summary : 15JG0043-48 Flood Control Projects
Deadline : 01 Sep 2015
Other Information
Notice Type : Tender
TOT Ref.No.: 3547961
Document Ref. No. : 15JG0044-48
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Zamboanga del Sur 2nd District Engineering Office
Guipos, Zamboanga del Sur
Tel. No. (02) 857-2016
INVITATION TO BID
The Bids and Awards Committee (BAC) of the DPWH-2nd District Engineering Office, Guipos, Zamboanga del Sur, invites contractors to bid for the following project/s:
Contract ID: 15JG0044
Contract Name: Repair/Maintenance of Boyugan Bridge Abutment Slope Protection and River Control
Contract Location: Boyugan, Kumalarang, Zamboanga del Sur
Appropriation: P 2, 500, 000.00
ABC: P 2, 475, 000.00
Contract Duration: 31 CD
Project Category: Flood Control
Source of Fund: SR2015-06-005800
Major Items of Work: Item 505(5) Grouted Riprap, Class A and Item 507 (Rubble Concrete)
Brief Description: The work includes 1. Removal of damaged river control (grouted riprap) and 2.Const. of revetment (grouted riprap with 0.10m thk. concrete facing with 10mm A deformed bars spaced at 0.40m on center both ways and with rubble concrete foundation).
Cost of Bid Docs: P 5, 000.00
Contract ID: 15JG0045
Contract Name: Repair/Maintenance of Diplo Bridge Abutment Slope Protection and River Control
Contract Location: Diplo, Kumalarang, Zamboanga del Sur
Appropriation: P 2, 500, 000.00
ABC: P 2, 475, 000.00
Contract Duration: 31 CD
Project Category: Flood Control
Source of Fund: SR2015-06-005800
Major Items of Work: Item 505(5) Grouted Riprap, Class A and Item 507 (Rubble Concrete)
Brief Description: The work includes 1. Removal of damaged river control (grouted riprap) and 2.Const. of revetment (grouted riprap with 0.10m thk. concrete facing with 10mm A deformed bars spaced at 0.40m on center both ways and with rubble concrete foundation).
Cost of Bid Docs: P 5, 000.00
Contract ID: 15JG0046
Contract Name: Repair/Maintenance of Gapo River Control
Contract Location: Gapo, Kumalarang, Zamboanga del Sur
Appropriation: P 1, 500, 000.00
ABC: P 1, 485, 000.00
Contract Duration: 19 CD
Project Category: Flood Control
Source of Fund: SR2015-06-005800
Major Items of Work: Item 506 Stone Masonry and Item 511 Gabions 1x1x2m
Brief Description: The work includes 1. Laying of 1x1x2 wire mesh gabion on scoured river bed (downstream of Reinforced Concrete Box Culvert and Pier of Gapo Bridge) and 2. Construction of revetment (grouted riprap with 0.10m thk. Concrete facing with 10mm A deformed bars spaced at 0.40m on center both ways and with rubble concrete foundation.) Length 10 ln.m both river bank.
Cost of Bid Docs: P 5, 000.00
Contract ID: 15JG0047
Contract Name: Repair/Maintenance of Limonan River Control
Contract Location: San Miguel, Zamboanga del Sur
Appropriation: P 4, 000, 000.00
ABC: P 3, 960, 000.00
Contract Duration: 49 CD
Project Category: Flood Control
Source of Fund: SR2015-06-005800
Major Items of Work: Item 505(5) Grouted Riprap, Class A, Item 507 (Rubble Concrete) and Item 405 Structural Concrete
Brief Description: The work includes 1. Removal of damaged river control (grouted riprap) and 2. Const. of revetment (grouted riprap with 0.10m thk. concrete facing with 10mm A deformed bars spaced at 0.40m on center both ways and with rubble concrete foundation).
Cost of Bid Docs: P 5, 000.00
Contract ID: 15JG0048
Contract Name: Repair/Maintenance of Rebokon River Control, Left and Right Bank Side
Contract Location: Rebokon, Dumalinao Zamboanga del Sur
Appropriation: P 3, 500, 000.00
ABC: P 3, 465, 000.00
Contract Duration: 44 CD
Project Category: Flood Control
Source of Fund: SR2015-06-005800
Major Items of Work: Item 505(5) Grouted Riprap, Class A, Item 507 (Rubble Concrete) and Item 405 Structural Concrete
Brief Description: The work includes 1. Removal of damaged river control (grouted riprap) and 2. Const. of revetment (grouted riprap with 0.10m thk. concrete facing with 10mm A deformed bars spaced at 0.40m on center both ways and with rubble concrete foundation).
Cost of Bid Docs: P 5, 000.00
The BAC will conduct the procurement process in accordance with the Revised IRR of R.A. 9184. Bids received in excess of the ABC shall be automatically rejected at the opening of bid.
To bid for this contract, a contractor must purchase bid documents and must meet the following major criteria: (a) prior registration with DPWH, (b) Filipino citizen or 75% Filipino-owned partnership, corporation, cooperative, or joint venture, (c) with PCAB license applicable to the type and cost of this contract, (d) completion of a similar contract costing at least 50% of ABC within a period of 10 years, and (e) Net Financial Contracting Capacity at least equal to ABC, or credit line commitment at least equal to 10% of ABC. The BAC will use non-discretionary pass/fail criteria in the eligibility check and preliminary examination of bids.
Unregistered contractors, however, shall submit their applications for registration to the DPWH-POCW Central Office before the receipt/opening of bids. The DPWH POCW-Central Office will only process contractors'' applications for registration with complete requirements and issue the Contractor''s Certificate of Registration (CRC). Registration Forms may be downloaded at the DPWH website www.dpwh.gov.ph.
The significant times and deadlines of procurement activities are shown below:
1. Issuance of Bidding Documents August 25 - September 14, 2015
2. Pre-Bid Conference September 2, 2015, 10:00 A.M.
3. Receipt of Bids September 14, 2015, 10:00 A.M.
4. Opening of Bids September 14, 2015, 2:00 P.M.
The BAC will issue hard copies of Bidding Documents (BD''s) at DPWH-2nd District Engineering Office, Guipos, Zamboanga del Sur, upon payment of a non-refundable fee for Bid Documents.
Prospective bidders may also download the BD''s from the DPWH web site, if available. Prospective bidders that will download the BD''s from the DPWH website shall pay the said fees on or before the submission of their bids Documents. The Pre-Bid Conference shall be open only to interested parties who have purchased the BD''s. Bids must accompanied by a bid security, in the amount and acceptable form, as stated in Section 27.2 of the Revised IRR.
Prospective bidders shall submit their duly accomplished forms as specified in the BD''s in two (2) separate sealed bid envelopes to the BAC Chairman. The first envelope shall contain the technical component of the bid, which shall include a copy of the CRC. The second envelope shall contain the financial component of the bid. Contract will be awarded to the Lowest Calculated Responsive Bid as determined in the bid evaluation and post-qualification.
The DPWH-2nd District Engineering Office, Guipos, Zamboanga del Sur reserves the right to accept or reject any bid, to annul the bidding process at any time prior contract award, without thereby incurring any liability to the affected bidder/s.
APPROVED:
Sgd. MANUEL J. INOFERIO
BAC Chairman
NOTED:
Sgd. AMINODIN P. MANIRI
OIC - District Engineer
Dates of Publication: DPWH Website -August 25-September 1, 2015
PhilGEPS Website - August 25-September 1, 2015
The Manila Times - August 27, 2015
Pre-bid Conference
DateTimeVenue
31/08/201510:00 AMDPWH 2nd DEO BAC Conference Room Guipos, Zamboanga del Sur
Other Information
Please follow the scheduled of bidding activities on the attached ITB. thank you.
Documents
Tender Notice