Procurement Summary
Country: Norway
Summary: 14-Bym-2026 Planning and Drainage of Agricultural Areas
Deadline: 29 Apr 2026
Posting Date: 15 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139570909
Document Ref. No.: 2026-106785
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
14-BYM-2026 Planning and drainage of agricultural areas Bogstad farm grows approx. 5-600 acres each year, with both silt and clay, and rocky moraine soil. We strive to use more regenerative methods in our agriculture to promote better soil health, increase carbon storage and reduce the climate footprint. Bogstad farm needs assistance to systematically drain two areas. * Sør-Bråtastykket, assignment to be completed in 2026 with systematic drainage of approx. 31 acres and approx. 400 running meters of cut-off trenching. Distance between the ditches is 6 meters and min. 1 meter depth * Sinober, option assignment for 2027. Sinober systematic drainage of 27 acres and other ditching (unsystematic) approx. 63 running meters. Distance between the trenches is 6 meters and min. 1 meter depth. In conclusion for each of these two assignments, the supplier must send digital trench maps with the final invoice. In order to be able to solve the tasks in a good way, the supplier must have equipment that is suitable for somewhat stony moraine soil. The supplier must carry out the drainage work and be responsible for it purchase of necessary materials to complete the assignment. Each drainage assignment will be considered a single assignment due to the size of the area, zoning, geographical distance, investment costs and the obligation to apply to local authorities. The Norwegian Environmental Agency has received public subsidy and necessary permits from Byantikvaren for these assignments. In the decision letters, conditions have been set that the ditch outlets that carry water in an open stream must be terminated with rigid pipes and erosion filters...
Documents
Tender Notice