Procurement Summary
Country: Russia
Summary: 1. Development of a Project for the Rd Stage of Replacing Smoke Exhausters Dn-12.5 in the Amount of 2 Pcs. for Smoke Exhausters Vgdn-12.5 Made of Alloy Steel with Operating Temperatures up to +400 °C. the Project Includes all the Necessary Section...
Deadline: 20 Jan 2026
Posting Date: 13 Jan 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 133580587
Document Ref. No.: 4288903
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
1. Development of a project for the RD stage of replacing smoke exhausters DN-12.5 in the amount of 2 pcs. for smoke exhausters VGDN-12.5 made of alloy steel with operating temperatures up to +400 °C. The project includes all the necessary sections, such as QOL, DU and others. The composition of the sections should be agreed upon... Expand 1. Development of a project for the RD stage of replacing smoke exhausters DN-12.5 in the amount of 2 pcs. for smoke exhausters VGDN-12.5 made of alloy steel with operating temperatures up to +400 °C. The project includes all the necessary sections, such as QOL, DU and others. Composition of sections agree with the Customer. Development of BOP and estimates is mandatory.2. Supply of VGDN-12.5 smoke exhausters made of alloy steel with operating temperatures up to +400 °C.3. Dismantling of existing smoke exhausters as equipment suitable for subsequent use.4. Installation smoke exhausters in accordance with the developed project.5. Commissioning works. Replacement of smoke exhausters of recovery boiler room No. 1. Collapse
Additional information:- Tag:Buildings and structures (design) Quantity:1 pcs. Total purchase cost: No price specified Type of currency: rub. When choosing the winner, the following is taken into account: Price including VAT (show both prices) Publication date:01/13/2026 09:20 End date submission of applications: 01/20/2026 12:00 Planned date for summing up The organizer indicated the expected date for summing up the results. If the procedure does not summarize the results when this date occurs, then participants can request them independently: 01/20/2026 Date last edited: 01/13/2026 09:20 Organizer: Donkarb Graphite LLC
Documents
Tender Notice