Procurement Summary
Country : Switzerland
Summary : Uw regensdorf / replacement and grid connection sbb 220 kv, gu tender civil engineering, building, hvac, planning performance
Deadline : 20 Feb 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 29144132
Document Ref. No. : 1052525
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : SWISSGRID AG
Bedarfsstelle/Vergabestelle Swissgrid AG, Strategischer Einkauf
Beschaffungsstelle/Organisator Swissgrid AG, Strategischer Einkauf, zu Hdn. von Knut Keiper, Bleichemattstrasse 30, 5001 Aarau, Schweiz, Telefon 41 58 580 21 11,
Switzerland
Email :knut.keiper@swissgrid.ch
URL :www.swissgrid.ch
Tender Details
Uw regensdorf / replacement and grid connection sbb 220 kv, gu tender civil engineering, building, hvac, planning performance
a new building with a new 220 kv gis switchgear is to be erected on the grounds of the two current reserve ais control panels. The building comprises a basement steel hall with a two-storey head building which acts as a command building. The gis plant (not part of this tender) will be located in the steel hall with the basement as a kabelkeller housed. In the head building there are telematics and battery rooms as well as others for their own use and the haustechnik.der new construction takes place during the operation of the existing ais switchgear. In addition to mastering the construction and civil engineering work, work on interior fittings (hvac, house installation, earthing and lightning protection) and planning services are also providedhrieben. 2.7 place of execution regensdorf zh 2.8 duration of contract, framework agreement or dynamic purchasing system 2 days after signing the contract this order can be extended: no. 2.9 options no 2.10 award criteria zk1 - price weighting 65% zk2 - references key figures - construction manager weighting 10%zk3 - references key figures - polier weighting 10% zk4 - order and risk analysis weighting 10% zk5 - safety concept weighting 5% definitions: zk2chips and two reference projects with comparable functions and tasks must be specified which are no longer than 10 years.zk3es are each cv and two referenzprthe contractor will draw up a construction concept consisting of the schedule, the technical report, a risk analysis of the construction project. The construction concept will be evaluated in terms of: -logical and efficient planning of the dates incl. Presentation of reserves -fullresponsibility and logic of the project organization and interfaces, resources, as well as depth and traceability of the technical report risk analysis with assessment of risks in the construction process including their prevention, treatment of risk factors quality, deadlines, costs, resources, specialist scheduling the order analysis must be based on the construction projectbe true and should be max. 15 pages are required. Comprehensive and executable concepts are required, which can be implemented on a case-by-case basis 1: 1. It is explicitly required that the implementation of the named measures is included in the offer prices.zk5the provider shall draw up a security concept regarding the procedure for compliance with himselfon-site and behavior near high-voltage electrical installations. The concept must be adapted to the current project and should be max. Have 5 pages. A comprehensive and detailed concept is required, which can be implemented on a case-by-case basis 1: 1. It is explicitly required that the implementation of the measures specified inthe offer prices is included. 2.11 are variants allowed no 2.12 are partial offers allowed no 2.13 execution date 2 days after signing the contract third
Documents
Tender Notice