Procurement Summary
Country : Ireland
Summary : Tii122
Deadline : 25 Jul 2018
Other Information
Notice Type : Tender
TOT Ref.No.: 24542975
Document Ref. No. : ITS Equipment Deployment
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : TRANSPORT INFRASTRUCTURE IRELAND (TII)
Parkgate business centre, parkgate street
Dublin
Dublin, d08 dk10
Attn: 25-07-2018 13:00
currency
Ireland
Tender Details
M50 traffic flow optimisation (mtfo) its equipment deployment mtfo is a programme of works to deploy intelligent transportation systems (its) to optimise the flow of traffic on the m50 and radials through lane control and the variability of speeds in response to conditions. The m50 is approximately 45km in length and includes approximately 75 nr. Existing gantries, as well as approximately 34 nr. nEw gantries proposed to be constructed under separate mtfo works. Advance motorway indicators (amis) and supporting variable message signs (vms) will be deployed on existing and new gantries to display lane control signals and/or variable speed limits. Operation of the amis will be informed through the deployment of roadside technologies to monitor the traffic conditions. Data collected on the current traffic speed, traffic volume, weather information, and road surface condition will be used to determine appropriate speeds at which drivers should be travelling, given current roadway and traffic conditions. The mtfo its deployment contract will consist of the supply, installation and maintenance of, but may not be limited, to the following equipment: advance motorway indicators (amis); variable message signs; controllers for variable message signs and amis; slip road signals (amis); accident incident detection system; enforcement system; gantry mounted and roadside enclosures for digital enforcement; cctv, ptz units and termination/interface unit; traffic monitoring devices; new emerging technologies additional power and telecommunications equipment to support the operation of the above equipment. It is envisaged that the project will include a five year period of support and maintenance services relating to the contractor supplied equipment. An information memorandum (im) document is provided as part of this notice that provided further details about this project, the other works associated with the enhancing motorway operation services
type of contract:
services
Response deadline (Irish time) 25-07-2018 13:00
Documents
Tender Notice