Procurement Summary
Country : Philippines
Summary : Supply of Labor, Materials and Expertise for the Replacement of Compressor Motor, IPCU Board and Main Board of ACCU 8A of the Toshiba VRF Air Conditioning System at Terminal 4 (R.I.S. No.: 19-83-319)
Deadline : 23 Sep 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 36455083
Document Ref. No. : R.I.S. No.: 19-83-319
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : MANILA INTERNATIONAL AIRPORT AUTHORITY
John Patrick Lazaro
Procurement Officer
MIAA Administration Building, MIA Road
Pasay City
Metro Manila
Philippines 1301
63-02-8771109 Ext.4300
63-02-8771756
jpl.procmiaa@gmail.com
Philippines
Email :jpl.procmiaa@gmail.com
Tender Details
Supply of Labor, Materials and Expertise for the Replacement of Compressor Motor, IPCU Board and Main Board of ACCU 8A of the Toshiba VRF Air Conditioning System at Terminal 4 (R.I.S. No.: 19-83-319)
Gentlemen:
Please submit your lowest price quotation (including taxes and government discounts) on charged account basis, on the following supplies/materials/ equipment or labor for the account and official use of the Authority. This Request For Quotation or your Formal Bid Proposal may be submitted through Fax # 877-1756 / through E-mail at procmiaa@gmail.com or personally submitted to Ms. Leticia Felix / Mr. John Patrick P. Lazaro at the Office of the Procurement Division on September 23, 2019 @ 2:00 pm, afterwhich it shall be opened.
Thank you.
ELSIE P. NITOLLANO
Manager, Procurement Division
NOTES:
1. Quotation may be submitted either typewritten (preferred) or handwritten.
2. ALTERNATIVE BIDS/A BID WITH OPTIONS SHALL BE REJECTED.
3. Request For Quotation can be obtained from the Office of Procurement Division on September 19 to 23, 2019.
4. Warranty shall be for a period of three (3) months, which shall commence after the final acceptance of the end-user.
5. Price validity shall be for a period of 120 calendar days from opening of bid.
6. Submit sample/s and brochure/s, if applicable, showing specifications of product being offered. Likewise state the brand in the RFQ or bid proposal.
7. If awarded, the bidder shall submit the required Registration Documents.
QTY. UNIT DESCRIPTION OF ARTICLES ABC/Lot UNIT PRICE
1 lot Supply of Labor, Materials and Expertise for the Replacement of Compressor 246, 220.80
Motor, IPCU Board and Main Board of ACCU 8A of the Toshiba VRF Air
Conditioning System at Terminal 4
1 unit Motor Compressor (3.6Kw)
1 unit Main Board
1 lot Consumables
SCOPE OF WORK:
1. Mobilization.
2. Shut off power supply and apply LOTO.
3. Pull-out defective parts.
4. Install new compressor motor and IPCU board.
5. Pressure test the system and check for leaks.
6. Vacuuming of the system.
7. Charging of refrigerant.
8. Start-up the unit.
9. Testing and commissioning, submit operating parameters.
Notes:
1. Prospective contractors are required to conduct site inspection to check the models of existing compressor motor and IPCU board.
2. Only interested contractors that complied with our request to conduct site inspection are eligible to bid to ensure realistic bid proposal and the
supply of compatible replacement parts.
3. Participating bidders are required to specify the model/part number of the parts to be supplied.
4. Submit certificate of OEM of the supplied parts from Concepcion-Carrier Air Conditioning Company (CCAC), the Authorized Distributor of Toshiba
Air Conditioner in the Philippines to ensure the parts are new and genuine.
5. The contractor shall be an authorized product installer and service company of CCAC to have the expertise of a legitimate air conditioning company
for technical support and prompt and reliable after-sales service.
6. Refrigerant (R-410A) to be supplied by the end-user.
Prepared and Canvassed By:
JOHN PATRICK P. LAZARO
Analyst
Procurement Division
MANILA INTERNATIONAL AIRPORT AUTHORITY
Tel. No.: 877-1109 local 4300
Closing Date : 2019-09-23
Documents
Tender Notice