WAKEFIELD COUNCIL has floated a tender for Kettlethorpe High School - Boiler Replacement Programme. The project location is United Kingdom and the tender is closing on 26 Apr 2019. The tender notice number is DN398421, while the TOT Ref Number is 32347592.
Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.
Procurement Summary
Country : United Kingdom
Summary : Kettlethorpe High School - Boiler Replacement Programme
Deadline : 26 Apr 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 32347592
Document Ref. No. : DN398421
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : WAKEFIELD COUNCIL Wakefield One Wakefield West Yorkshire WF1 2EB United Kingdom
Contact : Zoe Robinson
Telephone : +441924 306964
Email : zrobinson@wakefield.gov.uk United Kingdom Email :zrobinson@wakefield.gov.uk
Tender Details
A Contractor Is Required To Renew The Ageing Coal Boiler And Install With A New Gas Fired Boiler Plant. Works Include The Removal Of The Existing Heating System Equipment From The Plant Room And Coal Bunker At The School And The Demolition Of The Associated Chimneys And Associated Activity: •...Plant Room To Connect To The Existing Lthw Distribution Pipework Serving The Two Parts Of The School (Zones Identified As 'Tech Block And 'Primary ) And Existing Domestic Hot Water System• Modification To The Existing Electrical Distribution In The Plantroom To Serve New Lthw System Arrangement.
More...
A Contractor Is Required To Renew The Ageing Coal Boiler And Install With A New Gas Fired Boiler Plant. Works Include The Removal Of The Existing Heating System Equipment From The Plant Room And Coal Bunker At The School And The Demolition Of The Associated Chimneys And Associated Activity: • To Raise The Constructed Retaining Wall To Hold Back Embankment By Gas Meter And Build Concrete Plinth To Support Boilers • Installation Of New Louvre And Louvre Doors • Installation Of Nine New Modular Gas Fired Boilers To Replace The Existing Three Coal-Fired Boiler • Installation Of New 16M Gas Meter And Housing And Associated Pipework • Installation Of Pumps, Pipework And Ancillary Equipment In The Plant Room To Connect To The Existing Lthw Distribution Pipework Serving The Two Parts Of The School (Zones Identified As 'Tech Block And 'Primary ) And Existing Domestic Hot Water System • Modification To The Existing Electrical Distribution In The Plantroom To Serve New Lthw System Arrangement.
Less