Procurement Summary
Country : Egypt
Summary : Installation of Gas Metering System, Introduction of Waste Heat Recovery (Including with Organic Rankine Cycle Technology) from Compression Stations, Introduction of Turbo-Expanders for Power Production, & Consulting Services
Deadline : 08 Sep 2018
Other Information
Notice Type : Tender
TOT Ref.No.: 16393407
Document Ref. No. : 8818-GPN-48901
Competition : ICB
Financier : European Bank for Reconstruction and Development (EBRD)
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : EGYPTIAN NATURAL GAS HOLDING COMPANY (GASCO)
Attn: Eng. Mohsen Metwally,
Gas Plants Operations / Dr. Eng. Ahmed El Tonbary, Project Manager
Tel: +20-1005641680 / 1001080666
mohsen_metwally@gasco.com.eg / ahmed.eltonbary@enppi.com
Egypt
Email :mohsen_metwally@gasco.com.eg / ahmed.eltonbary@enppi.com
Tender Details
General Procurement Notice for Installation of Gas Metering System, Introduction of Waste Heat Recovery (Including with Organic Rankine Cycle Technology) from Compression Stations, Introduction of Turbo-Expanders at Selected Sites for Power Production, & Project Implementation Unit (PIU) Consulting Services.
The European Bank for Reconstruction and Development (EBRD) intends to provide a sovereign loan up to USD 200 Mln to the Arab Republic of Egypt to be on-lent to Egyptian Natural Gas Holding Company (EGAS) and its subsidiary Egyptian Natural Gas Holding Company (GASCO), the state-owned operators of the natural gas transmission networks in Egypt. The proposed project consists of energy efficiency investments in the Egyptian gas pipeline infrastructure fully consistent with the Green Economy Transition Approach (GET), thereby contributing to the enhanced sustainability of the gas transmission market and to the expansion of the ongoing policy dialogue effort in energy efficiency in the oil and gas sector.
The investment intends to include (i) waste heat recovery from compression stations at three gas processing plants: the Amerya Liquefied Petroleum Gas (LPG) Plant, the Western Desert Gas Complex and the Dahshour compression station, (ii) recovery of power from gas pressure reduction stations located at the downstream points of delivery to final users and gas distribution companies, and (iii) installation of gas metering systems throughout the Egyptian gas transmission network allowing for real-time accurate monitoring of the flow of gas.
The project has a total estimated cost up to about USD 200 Mln, and will require the procurement of the following goods, works and services:
Introduction of Waste Heat Recovery (including with Organic Rankine Cycle technology) from Compression stations at three (3) Project sites
Introduction of turbo-expanders at selected sites for Power Production
Installation of Gas Metering System
Project Implementation Unit (PIU) Consulting Services
The procurement process for the PIU Consultant (component no. 4) is planned to be initiated during 4th Qtr of 2017, component no. 1 by 2nd Qtr of 2018, and components nos. 2 & 3 later on when appropriate.