GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS BRANCH IN POZNAŃ has floated a tender for Expansion of the Bridge Across the River Gwda and the Bridge Across the Noteć River over the National Road No. 11 in the Village of Ujście. The project location is Poland and the tender is closing on 08 Dec 2021. The tender notice number is 589078-2021, while the TOT Ref Number is 60113349.
Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.
Procurement Summary
Country : Poland
Summary : Expansion of the Bridge Across the River Gwda and the Bridge Across the Noteć River over the National Road No. 11 in the Village of Ujście
Deadline : 08 Dec 2021
Other Information
Notice Type : Tender
TOT Ref.No.: 60113349
Document Ref. No. : 589078-2021
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS BRANCH IN POZNAŃ Address: ul. Siemiradzkiego 5A
Town: Poznań
NUTS-CODE: PL41 - Greater Poland
Postal Code: 60-763
Contact Point: Krzysztof Jahns Poland Email :przetargi.poznan@gddkia.gov.pl URL :www.gddkia.gov.pl
Tender Details
Document Type: Corrigendum / ADDITIONAL INFORMATION (PLEASE RETER TENDER Document) Title: Expansion of the bridge across the Gwda River and the bridge across the Noteć river throughout the national road No. 11 in the village of Ujście
Reference Number: o.po.d-3, 2411.87.2021
Contract Type: Works
Description: Expansion of the bridge across the Gwda River over the national road No. 11 in the outlet.
Characteristic parameters
Basic technical parameters of an existing object for demolition:
- debt. Total:
79.75 m;
- theoretical spans: 19.50 + 27.00 + 19.50 [m];
- Horizontal light (central sposs):
25.46 m;
- total width:
10.00 m;
- Width road:
7.00 m;
- intersection angle with an obstacle:
90 °;
- Load class: C according to PN-85 / S-10030;
- construction year: 1953-1954
Parameters of the designed object
- Position: indirect;
- vertical light: 4.22 m to the ordinant maximum water mirror 0.3% for proj.most;
- horizontal light: 64.50 m;
- debt. Total object: 86.70 m;
- debt. Total spans: 67.90 m;
- theoretical spans: 65.90 m;
- an ordinance of the bridge: 55.42 m np.m.;
- an ordinate of the bridge end: 55.47 m np.m ....