?????? ?????? has floated a tender for Contract notice: Works for complete or part construction and civil engineering work. The project location is Bulgaria and the tender is closing on 14 Nov 2018. The tender notice number is 446915-2018, while the TOT Ref Number is 27634686. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Bulgaria

Summary : Contract notice: Works for complete or part construction and civil engineering work

Deadline : 14 Nov 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 27634686

Document Ref. No. : 446915-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ?????? ??????
Office Name: ?????? ??????
Address: ???. „??? ???????????“ ? 1
Town: Sliven
Postal Code: 8800
Contact Point: ???. ????? ???????????

Phone: +359 44611127
Fax: +359 44662350
Bulgaria
Email :g_tujarova@abv.bg
URL :www.sliven.bg

Tender Details

Object of the contract
Works for complete or part construction and civil engineering work

Description: Contract notice: Works for complete or part construction and civil engineering work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45200000, 45200000, 71315000, 71221000, 45200000, 71315000, 71221000
CPV Description: Works for complete or part construction and civil engineering works

Construction services

Architectural services for buildings

Selection of contractor for elaboration of investment project, exercising of author's supervision and execution of construction and installation works for site: "Rehabilitation and internal repair of Children's cr-che № 3 - "Selection of a contractor for elaboration of an investment project, for exercise-author's supervision and execution of construction and installation works for the site: "Rehabilitation and internal repair of Children's cr-che № 3 Sliven" Main activities:

Main Site: Sliven, Children's cr-che № 3.

Main activities:

1 Development of a technical design, including the necessary working details for the needs of the renewal on the basis of the required mandatory measures in the section "Construction audit" and part "Energy Survey ". The technical project should be in scope and content according to the normative requirements of Ordinance No. 4/2001 on the scope and content of investment projects, Ordinance No. 7 / 15.12.2004 on the energy efficiency of buildings, - SG, No. 27 of 2015, in force as of July 15, 2015, as well as the specific requirements of the project ..

2. Exercise of author's supervision

3.The participant must have a registration in the Central Professional Register of Builders (TSRC) of the Construction Chamber for execution of constructions of the construction category, in which the object of the contract is placed І group at least a fourth category, and for foreign persons in analogous registers according to the legislation of the Member State in whichbut established or of another country party to the Agreement on the European Economic Area.

In case of merger the requirement is covered by the participant who will carry out the construction activities. The participant completes Section A: "Fitness" in Part IV: "Selection Criteria" of the Single European Public Procurement Document (EEDOP) (Appendix 1)

Prior to concluding a public procurement contractthe contracting authority requires from the participant designated as a contractor a copy of the Certificate for registration in the TSPR to the Construction Chamber for execution of construction works of the building category in which the object of the contract falls - for more information: http://register.ksb.bg/ ). If the participant is a non-resident person, he / she must present a Certificate of temporary or permanent listing in the CPRC to KamaThe participant must have professional liability insurance for the participants in the construction and the design under Article 171 of the TDA covering the minimum insurance sum for this category of construction - minimum category four, according to the Ordinance on the terms and conditions for compulsory insurance-in design and construction, or a relevant valid equivalent document.

The participant fills in box 5 of Section B: "Economic and Financial Condition" in Part IV: "Selection Criteria" by EEDOP

Before concluding a public procurement contract, the participant designated as contractor to submit the documents under Art. 62, para. 1, item 2 of the PPL - proof of the presence of insurance-Professional liability if they are not available through direct and free access to the relevant national database.If, for a good reason, the participant is unable to provide the documents requested by the contracting authority, it can prove its economic and financial situation with using any other document that the Assignor considers appropriate.

When submitting an offer, I study(s) complete only the relevant section of EEDOP.

Continued from Section III.1.3) Technical and professional capacity:

9. Designer under the "Waste Management Plan" (Waste Management Plan) - an engineer or equivalent, meeting the following minimum requirements: having full designer capacity under the Chambers of Architects and Engineers in Investment Design-(B) The participant should have the following management and expert team (staff) for the execution of the contract and CMP workers as follows:

1. Management and expert team:

1.1. A construction engineer or a construction technician according to Art. 163a of TGS or equivalent with professional experience in the specialty minimum 5 years - 1; Waste management specialist to meetthe following minimum requirements: have a certificate (certificate) to perform this type of activity - 1; Occupational health and safety specialist who meets the following minimum requirements: to hold a certificate (certificate) to perform this type of activity - 1; Minimum number of skilled workers:

2.1. Workers thermal insulation and plasterers - 5 pcs;.2. Emp. waterproofing - 2 pieces; Emp. Water Supply - 2pcs;

2.4. Emp. Electric - 2 pcs;

2.5. Emp. HVAC - 3 pcs. General Workers - 5 - 3. Participants should have the following tools, facilities and technical equipment to be used to complete the order:

1. Welding machine - 1 pc. Tube scaffolding - 700 m;

3. Drilling technique - 3 pcs. Vans - 2 pcs

2. The term for execution of the construction shall be considered as of the date of signing of the Protocol for opening of the construction site and determination of the construction line and level of construction - Figures 2 and 2 and according to Ordinance № 3 / 31.7.2013 for drawing up of acts and protocols during construction. The term for the preparation of an investment project shall be considered from the date of the contract for implementation of the order.

Note: pursuant to Art. 67, para. 4 of the Public Procurement Act (PPL) in connection with - 29, item 5, b. "A" of the Transitional and Final Provisions of the Public Procurement Act, in force as of 1.4.2018, the Single European Public Procurement Document shall be submitted electronically as well - The possible ways of submitting EEDOP in electronic form are as follows: signed and applied on a suitable optical medium topackage of documents to participate in the procedure. The format in which the document is submitted should not allow editing of its contents. By providing electronic access to the EEDOP prepared and signed electronically. In this case, the document should be provided with a so-called time stamp to certify that EEDOP has been signed and uploaded to the Internet address to which it is referred beforedeadline for receipt of bids

Important! In case EEDOP is filled in through the eEEDOP system, it should be signed with the electronic signature in PDF format by e-signature.

Remarks: According to EC instructions, ECEEDOP works with the latest version of the most popular browsers like Chrome, Internet Explorer, Firefox, Safari, and Opera. In order to avoid any problems, do-recommend using the latest version of the browser. It is also specified that some features, such as file downloads, do not work on smartphones and tablet computers. The eEEDOP system is an online application and can not store data, so EDEDOP in XML or PDF format must always be stored and stored locally on the user's computer.Here's the EUEAP system can be found at: http://ec.europa.eu/DocsRoom/documents/17242. The PPA's methodological guidance on the electronic submission of the Single European Procurement Document (EEDOP) - eEEDOP can be found at: http://www.aop.bg/fckedit2/user/File/bg/practika/MU4_2018. pdf. The EC's "e-EDP - Frequently Asked Questions" brochure can becan be found on: http://ec.europa.eu/DocsRoom/documents/17242.


Internet address (URL): www.sliven.bg