MIEJSKIE PRZEDSIE?BIORSTWO WODOCIA?GÓW I KANALIZACJI SPÓ?KA Z O. O. Z SIEDZIBA? W WA?GROWCU has floated a tender for Contract notice: Works for complete or part construction and civil engineering work. The project location is Poland and the tender is closing on 19 Oct 2018. The tender notice number is 406703-2018, while the TOT Ref Number is 26873331. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Contract notice: Works for complete or part construction and civil engineering work

Deadline : 19 Oct 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 26873331

Document Ref. No. : 406703-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : MIEJSKIE PRZEDSIE?BIORSTWO WODOCIA?GÓW I KANALIZACJI SPÓ?KA Z O. O. Z SIEDZIBA? W WA?GROWCU
Office Name: Miejskie Przedsie?biorstwo Wodocia?gów i Kanalizacji Spó?ka z o. o. z siedziba? w Wa?growcu
Address: ul. Janowiecka 100
Town: W?growiec
Postal Code: 62-100
Contact Point: Magdalena Lewandowska

Phone: +48 672622661
Fax: +48 672620126
Poland
Email :magdalena.lewandowska@mpwik-wagrowiec.pl
URL :http://mpwik-wagrowiec.pl/

Tender Details

Object of the contract
Works for complete or part construction and civil engineering work

Description: Contract notice: Works for complete or part construction and civil engineering work

Authority Type: Utilities entity
Contact Nature: Works
Procedure: Restricted procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45200000, 45252127, 71300000, 71320000, 45200000, 45252127, 71300000, 71320000
CPV Description: Works for complete or part engineering and civil engineering work.

Engineering design services.

Expansion and modernization of wastewater treatment plants in Wągrowiec

Reference Number: 1/2018

The contract includes the extension and modernization of sewage treatment plants in Wągrowiec.

Main Site: Wągrowiec

The order includes the extension and modernization of the cleaner

The implementation of the order is subject to Polish law, including in particular the Act of 07.07.1994 Construction Law, Act of 23.4.1964 Civil Code and the Act of 29.1.2004. Public Procurement Law. The contract for construction works (Contract) is carried out on the basis of contractual conditions for equipment as well as design and construction for electrical equipment and mechanical and engineering and construction robot designed by the Contractor.

The detailed description of the subject of the order has been included in Parts II and III of the ToR.

NOTE:

1. The contracting authority requires that the offer should cover the entire subject of the order and does not allow partial offers.

2. The Contracting Party reserves the obligation of the Contractor to perform personally the key scope of the robot being the objectm orders, i.e. a robot in the construction, construction and technology industries as well as AKPiA.

3. According to art. 29 para. 3a PZP The Employer requires employment on the basis of a contract of employment by the contractor or subcontractor, persons performing the activities indicated below during the implementation of the order: performing physical work on the implementation of construction works, equipment operators and physical work installationno-assembly covered by the scope of the order (this obligation does not apply to situations when these works will be performed independently and personally by natural persons conducting economic activity in the form of so-called self-employment, as subcontractors, and persons performing independent technical functions in construction) .108 with d. ). In the model contract for public procurement, which is Part-II SIWZ, rules for documenting the employment of such persons, powers of the Employer and obligations of the Contractor in the scope of controlling the fulfillment of the above obligation.

The Contracting Authority does not provide for the possibility of awarding the Contractor reimbursement of similar construction works referred to in art. 134 sec. 6 point 3 PPL.

The date of binding the Contractor by the submitted offer is 60 days fromexpiry of the deadline for submitting offers.

1. The Contractor is obliged to attach to the Application for admission to participate in the procedure, specimen specified in Appendix 1 to the IDW:

1) commitment of the entities to give the Contractor at the disposal of the necessary resources for the implementation of the order if the contractor relies on the resources of other entities, on the terms specified in art 22a PZP;

2) power of attorney;

3) The contractor places the password to access the EJF file in the content of his application, submitted in writing. The content of the application may contain, if necessary, other information for proper access to the document, in particular information about the encryption program used or the procedure of decrypting the data contained in the GOAL

2. The statement referred to in paragraph 1 point The contractor will obligeshall be submitted in the form of a Single European Order Document prepared in accordance with the standard form specified in the European Commission (EU) 2016/7 implementing regulation of 5.1.2016 laying down the standard form of the Single European Order Document, issued inter alia based on Article. 59 par. 2 of Directive 2014/24 / EU, hereinafter referred to as "uniform tothe document "or GO." A single document filled in by the Ordering Party in the scope of Part I is posted on the Employer's website along with the ToR.

The Employer will expect the Contractor to complete the information contained in the following sections and sections EAT:

1) Part II;

2) Part III, sections A, B, C, D;

3) Part IV section B, C;

4) Part V;

5) Part VI.

3. Contractor whorefers to the resources of other entities, in order to demonstrate the absence of grounds for exclusion and compliance with them, to the extent that they refer to their resources, the condition of participation in the proceedings, also submits uniform documents relating to these entities. EAT should be sent before the deadline for submitting an Application for admission to participate in the proceedings, in the form of an electronic letterqualified electronic signature and in accordance with the requirements indicated in the ToR.

5. Within 3 days from the date of receiving information about the results of the assessment of compliance with the conditions for participation in the procedure and received evaluations of compliance with these conditions, the Contractor shall provide the Employer with a declaration of affiliation or non-affiliation to the same capital group referred to in Art. 24 sec. 1 pkt 23) PPL. With the submission of a statement, the Contractor may provide evidence that links with another Contractor do not lead to distortion of competition in the procurement procedure. It is recommended to make a statement on the template, which constitutes Annex 2 to IDW.

1. The ordering party will call the contractor, whose offer will be the highest rated, before submitting the order, to submit in the designatedm, not shorter than 10 days of the current date as of the date of submitting statements or documents compliant with the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the contracting authority may request from the contractor in the contract award procedure (Journal of Laws 2016, item 1126) confirming fulfillment of the conditions for participation in the proceedings, selection criteriaji and no grounds for exclusion:

1) to confirm that the Contractor meets the conditions for participation in the procedure and the selection criteria documents listed in:

1.1) - 2 para. 2 point 3;

1.2) - 2 para. 2 point 2;

1.3) - 2 para. 2 point 4;

1.4) - 2 para. 4 point 1;

1.5) - 2 para. 4 item 8;

1.6) - 2 para. 4 point 10;

Note: if the Contractor relies on the ability of other entities to confirmTo meet the conditions of participation in the proceedings, attach the aforementioned documents to these entities

2) in order to confirm the absence of grounds for excluding the Contractor from participation in the proceedings documents listed in: - 2.1) - 5 point 1 - to the extent specified in art. 24 sec. 1 item 13), 14) and 21) PPL;

2.2) - 5 point 2;

2.3) - 5 point 3;

2.4) - 5 point 4;

2.5) - 5 point 6;

2.6) - 5 points 9;

2.7) - 5 points 5.

2.-If the Contractor has his registered office or place of residence outside the territory of the Republic of Poland, instead of the documents referred to in: - 1) par. 1 point 2) item 2.1) document mentioned in - 7 para. 1 point 1 within the scope defined in art. 24 sec. 1 item 13), 14) and 21) PPL;

2) sec. 1 point 2) sub-point 2.2) 2.4) - submits a document or documents issued in the country in which the Contractor has a registered office or place of exchangeeszkania, confirming that:

2.1) is not in arrears with paying taxes, fees, social security or health insurance contributions, or that it has entered into an agreement with the competent authority regarding the repayment of such receivables with possible interest or fines, in particular obtained the legally required exemption, postponing or spreading overdue payments into installments or suspending all of themdecision of the competent authority,

2.2) its liquidation has not been opened or bankruptcy has been announced.

3. Documents referred to in paragraph 1 point 1) and point 2) sub-point 2.2), should be issued not earlier than 6 months before the deadline for submitting Requests to participate in the procedure. The document referred to in paragraph 1 point 2) item 2.1), it should be issued not earlier than 3 monthsprior to the deadline for applications to participate in the proceedings.

4. If in the country in which the Contractor has his registered office or place of residence or place of residence has a person to whom the document applies, no documents referred to in paragraph 1 shall be replaced by a document containing the Contractor's declaration, indicating the person or persons authorized to represent himor a statement of the person to whom the document was to apply, submitted to a notary or before a judicial, administrative or professional self-regulatory or economic authority competent for the seat or place of residence of the Contractor or place of residence of that person. The provisions of para. 3 applies.

5. The Contractor having its registered office in the territory of the Republic of Poland, in referenceto a person residing outside the territory of the Republic of Poland, which is referred to in the document referred to in paragraph 1 point 2) item 2.1), submits the document referred to in para. 2 point 1), to the extent specified in art. 24 sec. 1 point 14) and 21) PPL. If in the country where the person whose document is to be residing is residing, such documents are not issued, it is replaced by a documentm containing a statement of that person made before a notary or before a judicial, administrative or professional body competent for the place of residence of that person. The provisions of para. The first sentence of Article 2 shall apply
Internet address (URL): http://mpwik-wagrowiec.pl/

Documents

 Tender Notice