ENERGIENETZ MITTE GMBH has floated a tender for Contract notice: Switchgear. The project location is Germany and the tender is closing on 14 Mar 2019. The tender notice number is 077594-2019, while the TOT Ref Number is 30791455. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Germany

Summary : Contract notice: Switchgear

Deadline : 14 Mar 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 30791455

Document Ref. No. : 077594-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ENERGIENETZ MITTE GMBH
Office Name: EnergieNetz Mitte GmbH
Address: Monteverdistrasse 2
Town: Kassel
Postal Code: 34131
Contact Point: EAM GmbH & Co. KG, Reiner Knieling Abt. Einkauf


Fax: +49 5619332512
Germany
Email :ausschreibungen@eam.de
URL :https://www.eam.de/

Tender Details

Object of the contract
Switchgear

Description: Contract notice: Switchgear

Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 31214000, 31214000, 31214000
CPV Description: Switchgear.

Renewal of 24 kV switchgear, secondary equipment and secondary cables in the substation Ottrau and substation Klostergut

UW Ottrau: Replacement of the existing open medium voltage switchgear by a 24 kV GIS DSS system with busbar rated current of 1250 A and renewal of the associated secondary equipment and the building Installation Technology

Main Site: Berfaer Strasse 11

The 20 kV switchgear of the substation Ottrau is to be renewed in the existing building. Specifically, the following lines must be provided: Dismounting a double busbar switchgear including the Sekundaerschraenke and the building installation. Primary and Sekundaerseitiger connection of a provided mobile medium voltage switchgear for the construction period and schResidual dismantling.

Primary and secondary connection of a provided TRA mobile system for the construction period and subsequent dismantling.

Delivery, installation and commissioning support of a 10-field 24 kV SF6-gas insulated switchgear with vacuum switches in double busbar design (rated voltage 24 kV, Rated current 1 250 A, rated short-time current 20 kA / 3s).

Installation and Icommissioning of the digital protection control units and the secondary technical connection of the 110 kV transformer and ground fault compensation systems.

Implementation of the existing TRA system in the existing building.

Supply, installation and commissioning support to secondary equipment to be supplied, such as control cabinets, components of the outdoor system, 230 / 400 V AC power supply, 110 V DC supply, etc., as well as the building installation (lighting, heating, sockets, etc.).

Removal of the 20 kV cable routes and the secondary cable routes between the building and the 110 kV outdoor system

Cable laying, installation and connection provided by the customer 20 kV cables

Documentation of the complete primary and secondary technology

Information and formalities required to comply with the requirementsng of the conditions to be checked: For this reference is made to the tender documents. The documents are available under the link given in I.3).

List and brief description of the conditions:

Information and formalities required to verify compliance with the conditions: For this reference is made to the tender documents. The documents are under the link mentioned in I.3) abru

1) As a precaution, it should be noted that the registration required in the procurement portal of the awarding authority may take up to one business day to submit the application to participate !!

1.1) Questions concerning the announcement are only available until 4.3.2019 (12.00) prepare electronic platform. Telephone information will not be given.

2. A replacement of Nachunternehmren, which have been designated in the application / the request to participate in the end of the point. IV.3.4) This notice specified deadline, but before the deadline fixed in the tender documents deadline for the first tender should be done only with the consent of the client. The approval is only when the new subcontractor his skills, efficiency and reliabilityProperly proves. The applicant / consortium must immediately notify the contracting authority of the intended replacement and must submit all necessary application documents (see points III.2.1 to III.2.3) of this notice) to the new subcontractor no later than the expiry of the deadline specified in the tender documents Tender submission to the client einzureichen. If the requisite application documents for the new subcontractor are not available by then, the applicant / community of applicants will be excluded. A replacement of the subcontractor after expiry of the deadline for the first submission specified in the tender documents is inadmissible and leads to the exclusion from the award procedure. The aboveshall apply mutatis mutandis in the event that the candidate / the community of intends to use a subcontractor for certain tender-related services for the first time.

3) A replacement of the applicant or a replacement / abolition of one or more members of a community of applicants is after the expiry of the in no. IV.3.4) of this notice4) It is intended, as a result of the competition, to invite a maximum of 5 suitable candidates to submit tenders. If in the competition more than 5 candidates are found to be suitable in principle, only the 5 candidates with the most aptitude points will be selected according to the evaluation stated in the conditions of participationgsskala and, after the weighting has been completed, to submit an offer.

5) No refund will be made for the preparation of the application and the offer, as far as this exclusion is permitted by law. Remuneration payments are also not made, if legally permissible.

6) EAM GmbH & Co. KG is the holding company of the EAM Group, which is also der contracting party EnergieNetz Mitte GmbH, responsible for the central group tasks such as Eg procurements. EnergieNetz Mitte GmbH thus becomes a contract partner of the successful bidder, while EAM GmbH & Co. KG carries out the award procedure on behalf of the EnergieNetz Mitte GmbH until the award of the contract.

7) EnergieNetz Mitte GmbH is a sector contractor within the meaning of - 100 Paragraph 1 Number 2 b) GWB. The invitation to tender is therefore carried out in accordance with -- 97 et seq. GWB in conjunction with the sectoral regulation
Internet address (URL): https://www.eam.de/

Documents

 Tender Notice