K?SZEG VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Street-lighting maintenance services. The project location is Hungary and the tender is closing on 16 Jul 2018. The tender notice number is 261760-2018, while the TOT Ref Number is 24284945. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Street-lighting maintenance services

Deadline : 16 Jul 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 24284945

Document Ref. No. : 261760-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : K?SZEG VÁROS ÖNKORMÁNYZATA
Office Name: K?szeg Város Önkormányzata
Address: Jurisics tér 8.
Town: K?szeg
Postal Code: 9730
Contact Point: Németh Ildikó

Phone: +36 94562517
Fax: +36 94562535
Hungary
Email :nemethi@koszeg.hu
URL :http://www.koszeg.hu

Tender Details

Object of the contract
Street-lighting maintenance services

Description: Contract notice: Street-lighting maintenance services

Authority Type: Regional or local authority
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 50232100, 50232100, 50232100
CPV Description:

Main Reference: EKR000164692018

Upgrading of the system of control systems

Main Site: Kőszeg Varos co-governor's terrarium

Approved, executable, acquiring purchaser of energy-efficient and modern construction projects the idle timerin auxiliary documents, technical brochure. The implementation of the contract will begin with the completion of the failed execution plans in the up-to-date brochure and technical brochure (in the same document).-The modernization of the existing system of operations with LED bullet-proof cells and designs is common.

In the context of this task, the existing, heavily used, out-of-date active element should be replaced by the modernization of the existing system.These energies are powered by LED light bulbs. The modern-day furniture was broken down by the 1883 pieces of wood and all accessories of the presently uplifting (leading joints, casting wires, corroded lampshades, zero waves). This may be the case with cases where the existing lamp cage or the electrical connectors are corrosive and mechanicI think they are suitable for receiving the planned new body of light. In today's state of the art, 1874 modern light bulbs with LED bulbs are to be delivered.

The executives should take on the full technical content of the entire project and complete all the tasks, including the design tasks and the implementation plan. You exclude this taskag by E.On Nszak-dunantuli Aramhalozati Zrt. can be used with system-equipped equipment. The work description of the work (bontas, epites) in the framework of the task is detailed in the Technical Survey.

The implementer of the validated experimental system

The implementer of the validated experimental system is equipped with the technical idle 15 (tizenoet) for a period of time. The duration of the lifetime is that of a day which, by the same token, corresponds to the sunshine of the technical idle.

All the equipment of the engineers is continuous and safe to maintain, preventing the failure. (The replenishment is the restoration of the original equipment (capacity, exactitude) of the waste disposal tool-Intermediates, while the maintainer of the toolkit includes continuous, uninterrupted, safe, and user-friendly interventions.)

The full-featured subcontractor contains the following:

- Continuous maintenance,

- Managing fault-related issues,

- Disruption of disruption,

- you can not be a time-winner, a boss, and not a runner-the economic operator who is the competent authority of the Kbt. For the exclusionary reasons set out in Article 62 para. (1) and (2). The jury excludes from the body of the co-insurer the time-maker, the sub-contractor or the suitably qualified organization against whom the exclusion is due to the above.-case, the organization providing the capacity is provisionally certified by the European Ecolabel Document (hereinafter referred to as EEKD), with the exception of a 321/2015. (1) and Section 3 of the Decree of the Government of the Republic of Hungary (hereinafter: the Government Decree): - In the case of a Koezoes time-stamp, each applicant shall be required to submit a form. If a timer is your chanceIf you are not satisfied with the capacity of the body or person, you will be required to submit a form to all the organizations or persons involved. Section 62 (1) (a), (c) -e), g-q) of the Act and the Kbt. Section 62 para. (2) of the basic rule of exclusion-falls, however, it has taken the intentions of the Kbt. Section 64 is justified on the basis of the agreement and this Debrecen Office of the Koezbeszerzesi. (4) of the Constitution, or in the case of a court order of the same person in his or her case, by virtue of the legally binding limit set out in Article 188 (5) of the Civil Code, shall be subject to both the exclusion of the exclusion and the intentroevid leavesat on the form imprint. The legally binding bounds to which they refer should be attached.

In relation to the subprojects that do not qualify as legally valid. Section (4) of Article 67 (4) must provide a statement that he or she does not claim the Application. (1) to (2) of Section 62.

If the sub-For more information, see the Kb. According to Section 69 para. (11), the complainant shall provide the exclusionary grounds and the supporting evidence for justifiable data bases. Such data bases must also be available to the economic operators in the appropriate sections of the form, subject to the availability of databases which are verified in the justification of exclusionary groundsIn the case of a current version of the Registered Data, the Provider shall be obliged to attach to the Data Provider a certificate of validity filed to the Cegovius Bank and a certificate validated by the Cegbirosag altal. If there is no processor, a listener must attach a statement to this effect.-Yes. Section 69 para. (2) of the EEKD may refer to a person in charge of a Hianyphotlase. According to Article 69 (3) of the Act, a time-consuming expert compares the intellects with the criterion of comparability. The timekeeper, with regard to the aspects that are most favorable to him, can be summoned with appropriate firearms with a suitable time limit for the exclusionary reasons and the appropriate test methodGovernment Decree III. Section 8, Section 10, Articles 12-16 of the Korm. - - 18 and - 18 of the Act shall be deemed to be in accordance with Chapter V if the distinguished economic operator certifies that he or she is in compliance with the requirements of the co-authorship clause

If the idle participant does not or hianthe ypotlast or the search for a subpoena does not adequately provide the credentials, the timeframe will ignore this time and, in consideration of the aspects of the matter, the most favorable viewer will be summoned to present the declarations and declarations. r. Section 1 (1) and Section 3 para., shall be preceded by an Act of the ESPDcomplain that it is in compliance with the applicable requirements. (4) - (7) of Subsection (4) - Subparagraph (4) - (7) of the Act on the Appointed Beneficiary shall be justified by the following:

(P1) The Beneficiary shall attach the basis of Article 19 (1) (a) of the Government Decree to each Supervisor from Penzueyan invasion, to the(P2) The submitter must attach the decree of Section 19 of the Decree of the Government of the Republic of Croatia ("The Act of Accession"), (1) (d) of the Law on the professional liability of the underwriter (security assurance, insurance-1) Accompanying the accreditation in this justification for the present jury: dr. Viktor Laszlo 00044.

2) The application form is available on the web site of the Kbt. Article 76 (1) (c) applies the golden aspect. The number of points in the range is 1 to 100 points in the interval (point scalable)allocate points for each timeout element.

1.

Pmax: the upper limit of the scoring line (100)

Pmin: the scoring line also has a margin (1)

Lower: the longest plus

Advice: P = [(Avizsgalt /Alegjobb) * (Pmax-Pmin)] Pmin.

2.

Pmax: the upper limit of the scoring line (100)

Pmin: the scoring is also limited (1).

Lower: the lowest element of the scoring time.

Pmax: Assumed: the content element of the examination period.

Path: P = [(Alemp / Psychic) * (Pmax-Pmin)] Pmin

Oasis:it is calculated on the basis of the above, and then the points taken into consideration for the decimal point multiplied by the given sum of sulfur are updated and the winning bidder will be the highest bidder on the base of the above mentioned mod. The timekeeper also shows the second timekeeper in the oesszegezes, (2) (e) of Section 75.

4) Reasons for exclusion shall be excluded: You will have to upgrade to the modern ones and the pay-as-you-go company, because your co-manager is the one who has the highest score service provider knows the result of saving electricity.

5) The timer does not timely test the time6) For the full text of the R-Phrasebook. Section 81 para. (4) of the Constitution provides that, in the present case, the resumption of arbitration for an unfairly low ar or examination of the arbitral award is likely to result in a timely assessment. In this case, the provider of newsletters is only the best time to offer time and if it is called the time magazine in oesszegezes, the second-it is best to look at the most favorable time in terms of the price of gold or coins, and use the money in accordance with - 72 in the same way. If the time of the offerer is unreasonably low because of low arrears or quarrels, it is in the order in which the runner-up time goes by and the suffocating arbitration actions-the periodical.

The Kbt. Section (4) of Paragraph 81 (4) shall be applied by the time-lapse exclusion if, in the case of a given period of time, the relative order of the preceding one is unchanged. Section 56 is based on the law. Hianypotlas and contact person is looking for the Kb. Section 71 seeksit is understood that a time-lapse does not assign a new hianypotlast if he is involved with the hianypotlass to include the economic operator who has not previously provided the time-maker, in view of the fact that he is in the process and in the view of that economic operator. from the reseller (s) to the host (project) repository.

9) Tajekoztatit is added that the Provider has more stringent terms of the P1) -P2) or M1) -M2) of the present user of the list of qualified timers.
Internet address (URL): http://www.koszeg.hu
Directive: Classical Directive (2014/24/EU)

Documents

 Tender Notice