BUNDESANSTALT FÜR STRAßENWESEN, REFERAT Z5 has floated a tender for Contract notice: Research and development services and related consultancy services. The project location is Germany and the tender is closing on 31 Jan 2019. The tender notice number is 488495-2018, while the TOT Ref Number is 28245343. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Germany

Summary : Contract notice: Research and development services and related consultancy services

Deadline : 31 Jan 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 28245343

Document Ref. No. : 488495-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : BUNDESANSTALT FÜR STRAßENWESEN, REFERAT Z5
Office Name: Bundesanstalt für Straßenwesen, Referat Z5
Address: Brüderstraße 53
Town: Bergisch Gladbach
Postal Code: 51427


Germany
Email :forschungsvergabe@bast.de
URL :http://www.bast.de

Tender Details

Object of the contract
Research and development services and related consultancy services

Description: Contract notice: Research and development services and related consultancy services

Authority Type: Ministry or any other national or federal authority
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 73000000, 73000000
CPV Description: Research and development services and related consultancy services.

FE 07.0300 / 2018 / MGB Investigation of the multilayer composite during the installation of rolled asphalt layers and layers using a paver with integrated spraying device

Reference Number: Z5kae - FE 07.0300 / 2018 / MGB

FE 07.0300 / 2018 / MGB

A requirement-oriented connection between asphalt layers and layers is a thinga prerequisite for a long service life of pavement pavements made of asphalt. The bond is u. a. achieved by the uniform and vollflaechige Anspruehen the pad with a bitumen emulsion. The applied bitumen emulsion must be broken according to the technical regulations before installation of the rolled asphalt layer and the emulsion water must be evaporated. The claimsThe risk of soiling and detachment or running off of the binder in stressed areas is a problem before overbuilding. The lack of bonding can be particularly concentrated on the areas of the rolling tracks. A method to reduce these unfavorable influences on the layer composite is the use of a road paver with integrated spraying device (Sprebuilder) used in DSH-V construction according to ZTV BEA-StB. When using asphalt pavers with integrated spraying device, however, it must be ensured that this does not have any damaging effects such as B. bubble formations to be incorporated in the rolling asphalts. Under what conditions a water vapor possibly forming from emulsion water escapesI can or must even escaping at thicker to be built asphalt layers at all, is not known. It is also unclear whether and to what extent residual water of an incompletely broken bitumen emulsion has an adverse effect on the compaction of the new, conventional asphalt layer and thus on the layer composite.

The aim of the research project is to establish criteria for the use of a-Asphalt paver with integrated spraying device for construction according to ZTV Asphalt-StB or on scratched surface.

For the application for the research contract the attached conditions of participation apply
Internet address (URL): http://www.bast.de

Documents

 Tender Notice