ZESPÓ? ELEKTROCIEP?OWNI WROC?AWSKICH KOGENERACJA S.A. has floated a tender for Contract notice: Repair and maintenance services of boilers. The project location is Poland and the tender is closing on 20 Aug 2019. The tender notice number is 328243-2019, while the TOT Ref Number is 34630693. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Contract notice: Repair and maintenance services of boilers

Deadline : 20 Aug 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 34630693

Document Ref. No. : 328243-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ZESPÓ? ELEKTROCIEP?OWNI WROC?AWSKICH KOGENERACJA S.A.
Office Name: Zespó? Elektrociep?owni Wroc?awskich Kogeneracja S.A.
Address: ul. ?owiecka 24
Town: Wroc?aw
Postal Code: 50-220
Contact Point: Urszula Kampik

Phone: +48 713238262

Poland
Email :urszula.kampik@gkpge.pl
URL :www.kogeneracja.com.pl

Tender Details

Object of the contract
Repair and maintenance services of boilers

Description: Contract notice: Repair and maintenance services of boilers

Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 50531100, 50531100
CPV Description: Repair and maintenance services of boilers.

Repair and replacement of flue gas duct after drying kilns to the surroundings (chimneys) of milling systems No. 1, 3, 4 in EC Czechnica

Reference Number: 1001229700

The subject of the order is: Repair and replacement of flue gas duct after drying furnaces to the surroundings (chimneys) of mill circulation systems No. 1, 3, 4 at EC Czechnica.

Main Site: Zesp-ł Elektrociepłowni Wrocławskich Kogeneracja S.A.

The scope of work includes all the work necessary to comprehensively perform the task of replacing a damaged brickwork together with the steel structure of the flue gas ducts behind the drying ovens to the surroundings installed in the system of mill installations No. 1, 3, 4 at EC Czechnica. As part of this work are envisaged:

- preparatory work,

- design work,

- facility work- 1 - execution of as-built documentation.

1 Contractors, who are:

1.1, can participate in the proceedings. They are not subject to exclusion, in accordance with item 15.2 of the TOR.

1.2. They meet the conditions for participation in the proceedings, in accordance with item 15.6 of the ToR. Contractors may participate, for whom there are no grounds for exclusion from the proceedings under Art. 24 sec. 1 point 12 23 of the Public Procurement Law, with reservationby virtue of art. 133 ust. 4 of the Public Procurement Law and are not subject to exclusion pursuant to art. 24 sec. 5 points 1 2, 4 and 8 of the Public Procurement Law. The exclusion takes place in the cases specified in art. 24 sec. 7 of the Public Procurement Law Act

3 Contractor who is subject to exclusion pursuant to art. 24 sec. 1 point 13 and 14 and 16 20 or par. 5 point 1 2 and 8 of the Public Procurement Law, may present with the offer evidence that the measures taken by him aresufficient to demonstrate its reliability, in accordance with art. 24 sec. 8 of Public Procurement Act

4, the Contractor is not subject to exclusion, if the Awarding Entity, considering the weight and special circumstances of the Contractor`s action, considers sufficient evidence provided by the Contractor under item 3 above.

5 In cases referred to in art. 24 sec. 1 point 19 of the Public Procurement Law, before exclusion of the Contractor, the Ordering Party fromthis Contractor may prove that his participation in the preparation of the contract award procedure does not distort competition.

6 Contractors who meet the conditions for participation in the procedure, specified in art. 22 par. 1 of the Public Procurement Law, regarding:

6.1 Competence or entitlements to conduct a specific professional activity, if it results from separate onesthe ordering party, ie: the Ordering Party does not set specific requirements to meet this condition.

The Contracting Authority will consider that the Contractor meets the condition of participating in the economic or financial situation proceedings, if the Contractor shows that he has a paid insurance policy against the sum insured less than PLN 5, 000, 000.00 (in words: five million zlotys)).

According to the documentation available on the portal: https: //pgeenergiaciepla.eb2b.com.pl


Internet address (URL): www.kogeneracja.com.pl

Documents

 Tender Notice