Procurement Summary
Country : Poland
Summary : Contract notice: Repair and maintenance services
Deadline : 27 Aug 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 34855656
Document Ref. No. : 341110-2019
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : POLSKIE SIECI ELEKTROENERGETYCZNE S.A. — DEPARTAMENT ZAKUPÓW
Office Name: Polskie Sieci Elektroenergetyczne S.A. — Departament Zakupów
Address: ul. Warszawska 165
Town: Konstancin-Jeziorna
Postal Code: 05-520
Contact Point: Kamila Kapu?ci?ska-Oneksiak
Poland
Email :kamila.kapuscinska-oneksiak@pse.pl
URL :http://www.pse.pl
Tender Details
Object of the contract
Repair and maintenance services
Description: Contract notice: Repair and maintenance services
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 50000000, 50000000, 65320000, 71314000, 50000000, 65320000, 71314000
CPV Description: Repair and maintenance services. Provision of operating services on linear power facilities PSE S.A. NN belonging to PSE S.A. in the area of ZKO Katowice, ZKO Poznań and ZKO Bydgoszcz
Reference Number: 2019-WNP-0181-DU-KKO
1) The subject of the order is the provision of operating services on linear elEutro-energetic NN belonging to PSE S.A. in the area of ZKO Katowice, ZKO Poznań and ZKO Bydgoszcz in accordance with the scope specified in Part II of the SIWZ.
Main Site: Power lines in the area of PSE S.A. ZKO in Katowice, POLAND
1. As part of the subject matter of the contract, the Contractor will carry out work on linear LV power facilities consisting of:
1.1. performing planned work expeditionsin the field of maintenance of the PSE S.A. transmission network facilities in proper technical condition. A list of these facilities along with the limits of their property distribution is given in Chapter IV of the second part of the ToR. As part of this work, a visual inspection of LV power lines is planned, periodic measurements resulting from internal instructions and generally applicable regulations as well as implementationwork resulting from annual assessments of technical condition. The scope of works planned to be carried out in a given calendar year results from the approved Annual Maintenance Plan, a model which is presented in Annex 2 to Part II of the ToR. The Contractor, each time after receiving confirmation from the Employer of works for a given month, will present to the Employer a preliminary calculation for confirmedwork.
1.2. performing unscheduled maintenance works, including operational works related to the maintenance of network assets, based on single orders and agreed prior to the awarding of a one-off order, preliminary calculations and work completion schedules (excluding non-plan inspections indicated in - 3.10 3.10). 1. Model umPart IV of the ToR). In the framework of this work, it is foreseen in particular to carry out works related to the irregularities found during the annual or unplanned inspection of the line. The basis for conducting and receipt of scheduled work is the approved Annual Maintenance Plan, and for unplanned work, each time a one-off order is placed by the Employer.es of a special condition - the Contractor has financial resources or creditworthiness divided into individual packages in the amount not less than:
Package 1: PLN 3, 000, 000.00,
Package 2: PLN 2, 000, 000.00,
Package 3: 2 PLN 000, 000.00.
In case of having financial resources or creditworthiness in a currency other than PLN, the exchange of these values will take place at the average exchange rateconfiscated by the NBP on the date of publication of the contract notice in the Official Journal of the European Union. In the event that on this day the NBP (table A) does not publish the average rate table, the Contracting Party will take as a basis the exchange rate from the table of average rates announced on the first day after the publication of the contract notice in the Official Journal of the European Union.erty EAT and power of attorney (if applicable), the offer form (along with the price form), proof of payment of the bid bond. At the request of the Ordering Party, the Contractor is obliged to provide: KRS / extract from the records, KRK, Social Insurance Institution / KRUS, Tax Office, information from the bank, List of services, Statements in the scope indicated in SIWZ. Detailed information on the documents that the Employer requires can be found on the websiteEntry of the Ordering Party in the directory https://www.pse.pl/przetargi/przetargi-publiczne/przetargi-publiczne-aktualne
Termin of the offer defined as 2 months - is understood as 60 days.
Internet address (URL): http://www.pse.pl
Documents
Tender Notice