MÁV MAGYAR ÁLLAMVASUTAK ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has floated a tender for Contract notice: Railway-track maintenance services. The project location is Hungary and the tender is closing on 23 Jul 2018. The tender notice number is 262653-2018, while the TOT Ref Number is 24287656. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Railway-track maintenance services

Deadline : 23 Jul 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 24287656

Document Ref. No. : 262653-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : MÁV MAGYAR ÁLLAMVASUTAK ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG
Office Name: MÁV Magyar Államvasutak Zártkör?en M?köd? Részvénytársaság
Address: Könyves Kálmán Krt. 54-60.
Town: Budapest
Postal Code: 1087
Contact Point: Szilágyi Balázs

Phone: +36 302771576
Fax: +36 15117526
Hungary
Email :szilagyi.balazs@mav.hu
URL :http://www.mavcsoport.hu

Tender Details

Object of the contract
Railway-track maintenance services

Description: Contract notice: Railway-track maintenance services

Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 50225000, 50225000, 50225000
CPV Description: Railway-track maintenance services

Accidental damage and intrusion

Reference number: EKR000165792018

"Accident crash and groin" as follows: Railway accident service and rail chemical damage

Main Site: MAV Zrt. .

"Accident damage and swallowing" according to the following: Vasuti chemical wastewater:

hazardous goldthe use of a tank, a tank, a cargo, a drip, a seizure of auxiliary goods, a cargo of wreckage wagons on a loaded pallet, or a bargraph at the end of a professional rally. temporaryin the event of a dispute, the carriage may be carried out by a person or by a person who is responsible for the transportation of the dangerous goods, with the provision of dangerous goods, the safe atrakas, theft of the cargo, and the carriage of the goods by accident, (to do so), doentes about raising and having it(perlite, sand), testosterone (eg, bacterium culture, sedimentation of the dehydrogenase (CH)), insect repellents, the Customer with the Dog Breeds and the-in the palyavasuti (halozati) dispatcher.

in the palyavasuti dispatches crossing initiates the release material to the place of transport, and then the iron palyan to be dismantled to remove the fumes of the smoked palyavasuti enthusiasts, in the case of a coefficient of impacts MAV SZK Zrt. Coarse-grain impregnation coefficient of impuritiesIn the interest of the experts of the disaster industry, they are assisted by the experts of their work.

AT the chemical raw material delivery service is provided by the contractor every day, 24 hours a day cross-over, and further iron-based service on the basis of the customer's order.

Vasuti balesetelharitoi service: the task of the mentally retarded mentors in the technical ment and the assistants-• If you want to work on a technical flyer, you should be able to do so in the event of a traffic jam, so that you can get the lowest traffic you want to get in the event of a traffic jamming. you need to move the derailed, defective jarmes, hogand at least the least amount of leverage in all of the other railway equipment.

At the railway accident service every day, every day, 24 hours a day, crossing the Szombathely Teruelet and Miskolc Teruelet, where the premises are 12 hours daytime must be secured, and a dead-line accident service will be provided

Please note that AK will continue to complete 320/2015 with the checklist for the Trial Chamber Debt Process. (X.30.) K.r. according to its provisions, thus the author of the justification for this. a K.r. Section 12 (5) in the case and at the time, Article 13 - 1 (a) or (b) or in Article 13 (3). sin the case of a case and at the same time, the test results deriving from the author will be terminated with an absolute residual performance.

In the procedure, there is no AT, subcontractor and no eligible economic operator who is authorized by the Kbt. (In accordance with Section 62 (3) to (5) of the Kbt.-Section 63 (3) and Section 64 of the Kbt.). Article 74 (1) (b) of the EC Treaty requires the CA to extract the AT, the sub-contract or the eligible body that has been subject to the exclusion of the former. the time period oesszeallitasanal be tested with regard to 321/2015. Government Order. 1 to - 16.

Verification: Subject to the provisions of Subsection (67) (1) of the Kbt., The AT shall be obliged to investigate the exclusion of the exclusionary grounds and to comply with the declarations contained in the Single European Contract Law Document (EEKD) .

According to the Kbt.67 - (4), the AT must declare that it does not require the contractor to perform the contractenter the Kb. (1) and (2) of Article 62 (1) and (2). The declaration must also be made if CA does not disclose the name of the known subprojects in the above mentioned terms.

In the case of Section 65.- (3), if the aforementioned test procedures have been complied with by the AT body capacity capacity, it must be up to date to have its capacities available(1) of Section 65 of the Kbt. according to Section 15 (2) of Decree 321/2015 (X.30.), in the case of subproblems that are not reasonably justified by the provisions of AT. Section 66 (4) of the Kbt. The AK is obliged to submit a written statement to the eljarast lezaro doentes in accordance with the provisions of the Kbt.69 (4) - (7)prior to the date, I invite AT to submit the documents specified in the KD, which prove that the AT does not fall within the scope of exclusionary grounds set out in 321/2015. (X. 30.) Gov. order. (8) and (10) of Act LIII of 2017 on the basis of Article 8 (b) and 10 (b) tv.3. - 38 (a) -b) or d) is replaced by the following:

If the relevant test methodsif the body of the body is responsible for the capacity of the body, it is not possible for the organization to provide the capacity of the attorneys at the outset, with the same modalities as the proving modalities, in accordance with the appropriate test requirements, to suit the specific requirements. It's a good idea to get a chance at the ATAttached by Kbt. 65 (7), the document containing the evidence of probation must contain the provisions of Section 65 para. (8). shall be accompanied by the AT authority of the date on which the declarations to be made by electronic means in the EDF may be exhausted by the organization in question. Section 15 (1) the AT is the startonly the EEKD shall be tried by the competent authority in the case of a subcontractor or a body in order to substantiate the exclusion of the excluded grounds contained in the Kbt.62 -- (1) - (2). In the case of a subcontractor who is eligible for VAT, with the EEKD's statement, AT complies with Section 65 Subsection (4) of the Kbt.

AK invites ATs to note that-In accordance with the provisions of Section 74 (2) (a) of the Kbt., They reserve the right to exclude the AT from the proceeding who does not have to be nationally insured [Article 2 (5) of the Kbt. the attention is drawn to the provisions of Section 64 of the Kbt. for a preliminary and utterly justified cause. declarations, and verifiable modalities are kept by the KD.

No kerel albiotics.

Tek. the TED Publish. strict characterization AK gives the other information fully in the KD. At this point, only the KD expired mode and the specific chessboard spec. the information contained in the above-mentioned information on AT-related testing is not covered by AK at this point. AK is concerned that the provisions of Section II.1.5. eand II.2.6. point just for the clinker, h a hird. half of the TED is passed over, the infs are not light. Section II.2.7. 36 hours per day, 13140 days, and 2 hours per day in IV.2.6). The KD is free, electr. all interested NGOs may submit the EDF website (www.ekr.gov.hu) under the name of this list. The reregister invites the attentionhe is considered to be excluded by the farmer, who has indicated the interest in the EDR. The most important feature of the program is by electronic means, electronically, by the crosses of the EDF. The electronically submitted time limits are set by the EDF, so that the times can be made available on the date of the donation.-The documents containing the timescales are opened by the EDF as the time limit expires, and starts two or more times longer.

The M / 1, M / 2. alk. the test subjects have to be tightened more strictly for the qualitative aspects of the certified ATs, which is why the AT must also certify the author. their full capacity is lightweight.The M / 1. alk. Koev. tek. the AT should declare that professionals are the most subordinate to the AK subsection of the oesszegzest koev. until the end of his contracted day. they will be with the legitimate candidates listed in the KD. AT must further declare that it is aware of the fact that, if it is not in the register, this winning AT qualifies as a penny. Article 131 (4) bthe beginning of the process. AK does not try to give you the information you need in these terms. The AK does not allow the opportunity to resign. AK will provide you with professional times, and the test methods are included in the KD. AT, as a matter of fact, is enclosed with the statement contained in the EEKD. (2) and (4) of the Kbt. . The Kbt. Section 66 (2) bythe original statement must contain the timing. The CA shall indicate the Kb in time. Section 66 (6) (a) to (b). Including a non-binding statement. The time limit shall be extended to the date indicated in point IV.2.2). In. The method. in case of 321/2015. (X.30) Section 13 para. Iranyado. No declaration-also attached. The author and the complete language are Hungarian. The right to copyright: the Hungarian. The Hungarian bureaucratic jurisprudence is challenged by the AK and the winning AT contingent relationship. If the deadline for the deadline is not set, the CA maintains the 424/2017. Section 26 (2) of the Government Code. Physiologist: dr. Krisztian Kovacs (registered office)zama: 534). CA does not apply in the justification for the application. Section 75 (2) (e). AK can apply the criteria in 424/2017. (26) (2) of the Korm
Internet address (URL): http://www.mavcsoport.hu
Directive: Classical Directive (2014/25/EU)

Documents

 Tender Notice