MAGYAR KÖZÚT NONPROFIT ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has floated a tender for Contract notice: Mowers. The project location is Hungary and the tender is closing on 19 Oct 2018. The tender notice number is 404915-2018, while the TOT Ref Number is 26863790. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Mowers

Deadline : 19 Oct 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 26863790

Document Ref. No. : 404915-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : MAGYAR KÖZÚT NONPROFIT ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG
Office Name: Magyar Közút Nonprofit Zártkör?en M?köd? Részvénytársaság
Address: Fényes Elek utca 7-13.
Town: Budapest
Postal Code: 1024
Contact Point: Dr. Kleithal Mariann

Phone: +36 18199177
Fax: +36 18199540
Hungary
Email :kleithal.mariann@kozut.hu
URL :http://www.kozut.hu

Tender Details

Object of the contract
Mowers

Description: Contract notice: Mowers

Authority Type: Body governed by public law
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 16310000, 16310000, 16310000
CPV Description: Mowers

Kaszalo eskoezoek beszerzese

Reference Number: EKR000409032018

Kaszalo eskoezoek beszerzője

Main Site: 4558 Ofeherto, Batori ut 65 67; 3432 Emőd, Karolai ut 50; 2061 Bicske, 0325 hrsz .; 8882 Eszteregnye, Celinkai ut 1.

Purchase of double-sided double-sided treadmill machines with the following main technical parameters:

Delivery quantity: 5 pieces

A megaj-nlanThe grip must be suitable for use with stubble stones and steep ripples, for the treatment and care of the light chute, with the attached swingarm mower adapter.

The grip must have a wind turbine and an ergonomic design with a conductive material. Fuelke windows can be opened, ventilated ventilator provided.



Technical data:

- artificial: with built-in diesel fueled motor - - coarse-grained water level: III.B emission standard - full performance (rough-cut plaster): max. 55.2 kW / 75 hp,

- number of cylinders: min. 4



Engine Cooling: Water

- Manual: Hydraulic (servo)

- PTO-drive revolution: min. 540 rpm

- oensuly: max. 3, 000 kg

- Hydrostatic Oxygen Wheel Drive with 2 Speed Limits

- Actuator - 180 Reversible Steering Wheel - Oiler Wheel Drive - Differential Fuel - Fuel Consumable: With Ventilated Fan - - Integral Factory Air Conditioner equipped with Fuel Kettle - guarding / leadinglke

- moving speed range: 0-40 km / h

- driver's windscreen mounts - instrument panel elements: engine speed, travel speed, cool water temperature, flux level and display of fault symbols, uezemora samlalo

- sarga villogo, placed on the top of the fuelkeys, or in its uppermost coextension,

- the juniper tire, low-pressure, balloon terrain, The technical requirements of the handle adapter:

- drive: the base line from the PTO axle

- flashing: 3 points burnished

- vascular structure:

Horizontal shaft axle, hail, cap, design

- soil-like:(in case of heavy and low-pitched artifacts): min. 40 mm

- working width: min. 2 000 mm - max. 2 150 mm

- toemege: max. 500 kg

- the treadmill of the mower adapter can be extended with the spindle axle axle - can be extended to the side: with hydraulic flywheel left / right - freewheeling pivot axle or saddle driver



- plus a full set of spacers with roping elements (screw, bracket, etc.)!

The extensive technical requirements and the wise tasks of the winner will be provided in the co-procurement documentation of the winner.

In all respects: No it may be time-consuming, subtle, and can not take the opportunityAg is a true economic operator who is a party to the Kb. For the exclusionary reasons set out in Article 62 para. (1) and (2). The awarding authority excludes from those who are subject to a breach of contract as a result of which the exclusion is due to the above mentioned criteria. Article 67 (1) of the Basis Provider shall, as appropriate, provide its capacity allocation facilitythis is being investigated in the meantime in the context of the exclusion of exclusionary reasons in the Single European Charter Procurement Document (hereinafter referred to as EEKD), by submitting a list of persons with a legitimate right to vote in 321/2015. (X. 30.) Government Decree II. . In the case of a timeshare, all the test-takers have been listening to EEKD• In the case of subprojects that do not qualify as legally valid, the Kbt. Article 67 (4) of the Basic Time Provider must declare that he or she does not apply for a License. (1) - (2) of - 62.

If the time limit for submitting the application is about the Kbt. According to Section 69 para. (11)to exclude any reason for the existence of databases, these databases must also be affixed in the appropriate form in the form, with the exception of those which are verified in the exclusionary grounds by the Provider of Amendments to 321/2015. (X. 30.) Decree of the Minister of Public Order - In the case of a current version of the memorandum of registration, the submitter shall, for the time being, test the attachment to the cegbirosaga certificate of registration and a certificate stemming from the delivery of the goods. If there is no progress report, the person making the offer must declare it.

Exact proof of any and all of the following:

The Kbt. According to Article 69 para. (4), the person (s) referred to in subsection (4) (X. 30.) Government Decree III. in Chapteraccording to the testers to prove it. Section 62 (1) (k) (kk) shall be justified as follows:

Preventing and preventing the financing of terrorism from terrorism 2017. evi LIII. toerveny (penzmosasrol szolo toerveny) 3. - 38, points a) -b) or d) all pro rata owners are known and allando easy to place presentation contentzo statement; if the economic operator does not have a beneficial owner under - 38 (a) to (b) or (d) of paragraph 3 of Article 38, a declaration of this kind shall be annexed to it. (X. 30.) Government Decree III. in accordance with Chapter V, if the distinguished economic operator plays a role in classified quotesproof that it complies with the requirements of the co-procurement procedure. To allow for the concession pursuant to - 64.

P / 1. Primary Verification in all respects:

For the time period (Kbt.) And the organizer of the capacity (if any) Article 67 (1) to (2) and the contract of saleas well as the 321/2015. (X. 30.) Government Decree II. In accordance with the sections of the EEKD, you must certify in advance that you are in compliance with the terms and conditions specified in the license. The provisional validation of the appropriate test methods in the EEKD pursuant to - 2 (5) of the Korm.(the provider, capacity-providing organization) should only declare that it complies with the requirements of the applicable test methods (EEKD IV.

If a time-consuming person meets the requirements of a suitable body or body, it is the responsibility of the excluded organizations or persons (hereinafter referred to as capacitasorganization) shall submit a form to each of the undersigned and the undersigned.

Exact verifier in all respects:

The Kbt. (4) to (6) of Section 69 of the Civil Code, the originator (s) referred to in Article 19 (1) (c) of the Korm. Decree shall certify that he or she meets the requirements of the applicable requirements, including the time- koezoes timerto the full capacity of the organization / organization prior to the deadline for submitting the request, the total net arbeveter of the deadline in which the deadline has expired, at a glance at the time when the data sender wrote to the letter and when he started the activity if these data were available. the provider is in a legal form in which the P /You can not submit a document according to the test method, except for any applicable test and certification modalities, and any other statement or document justifying the payment period may be used to justify the pennies and the economic capacity. The excellence of a well-timed surgeon is to prove that he is in a legal form thatIt is not possible to make a declaration of intent to obtain a declaration of intent and not to apply the appropriate modalities and verifiable modalities in relation to these points. Szamla's issue of an order is made to ordern option. The equalization of the standardized amount is equal to the 30-day pay-time limit, in Ptk 6: 130. - (1) and (2), the Kbt. Section 135 (1) and (5) - (6).

Continuation of IV.2.7): At the date of expiration, the time frame in the EDF system is the date of themara are available. The Kbt. (4) of the EC Treaty, the EDF shall immediately electronically receive the EDF from the date of expiry of the deadline, as provided in the timeliness. Section 53 (5) and the Kbt. Section 135 (12) of the Constitution.

2) The Provider shalljarast according to the EDF Ordinance electronically in the EDF

3) To submit an offer electronically to the place where it is located: https://ekr.gov.hu/portal/kozbeszerzes/jelarasok/EKR000409032018/results-Time for the time period expires until the date must be electronically entered. From the timeframe of the beer handbook, the EDF acknowledges the receipt of the receipt.

4) In the period csaturated documents are fully enclosed in the Documentation.

5) The timeframe must include the express written statement of the prospective Bidder. Article 66 (2) and (6) (more or less even). Applicants shall not be required to make a statement on the basis of Section 20 para. (4) of the EDR Regulation. (4) of - 66.

4) (a) In the meantime, the provisions of the EDF Regulation-The form provided by the EDF on the basis of paragraph 1 of Article 11 (1) must be accompanied by an appropriate reading of the reading room. 6) The Trustee shall call attention to the fact that P / 1. and M / 1. (7) The timekeeper is timed in the Kbt.35. Section (5) and Article 54 (4) - (7). applicationin the case of the 1st amount HUF 1 500 000, in the 2nd aspect HUF 3 000 000, and in the case of the third amount HUF 1 650 000 will be paid for loan funds. The commissioner has to give up on the date of the deadline. Providers may, depending on the time of their choosing, be able to meet the pre-paid pennies with the time-controlled MKB Bank 10300002-10460102-49020027 payable amount of money with a payment order, pennies interest or a secured guarantee or a solicitor or secured by a licensed underwriter with a trusted assignee. You must provide proof of payment by the payer or by the payment agent. Thethey should be timely enough to be timely. If you do not have the time insurance provider for the time limit or if you do not have the time to give it, the timer will be out of date.

Continue in VI.4.3.
Internet address (URL): http://www.kozut.hu

Documents

 Tender Notice