SOCIETATEA DE DISTRIBU?IE A ENERGIEI ELECTRICE MUNTENIA NORD S.A. has floated a tender for Contract notice: Maintenance and repair of computer equipment. The project location is Romania and the tender is closing on 15 Apr 2019. The tender notice number is 116177-2019, while the TOT Ref Number is 31475457. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Romania

Summary : Contract notice: Maintenance and repair of computer equipment

Deadline : 15 Apr 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 31475457

Document Ref. No. : 116177-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : SOCIETATEA DE DISTRIBU?IE A ENERGIEI ELECTRICE MUNTENIA NORD S.A.
Office Name: Societatea de Distribu?ie a Energiei Electrice Muntenia Nord S.A.
Address: Str. M?r??e?ti nr. 44
Town: Ploie?ti
Postal Code: 100024
Contact Point: Mariana Corneanu

Phone: +40 244405350
Fax: +40 244405354 / +40 244405004
Romania
Email :mariana.corneanu@distributie-energie.ro
URL :www.mnd.distributie-energie.ro

Tender Details

Object of the contract
Maintenance and repair of computer equipment

Description: Contract notice: Maintenance and repair of computer equipment

Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 50312000, 50312000
CPV Description: Maintenance of IBM equipment

Reference Number: RO14506181, PAAS 2019, P4-2019

Acquisition of IBM equipment maintenance to ensure optimal performance of servers and storage devices in S.D.E.E. North Muntenia, namely: RISC servers (p series), Intel servers (x series), HMC consoles, Storage Srea Network (SAN) systems, bookstore libraries.

Main Site: Electricity Distribution Company Muntenia Nord S.A. (including its subsidiaries)

Estimates of the minimum and maximum quantities that may be required throughout the Framework Agreement:

Minimum estimated duration of the framework agreement: Maintenance for 81 equipment

Maximum estimated amount over the duration of the framework agreement: maintenance for 136 equipmentof the minimum and maximum quantities that could be the subject of a single subsequent contract from those to be awarded during the duration of the framework agreement:

Minimum estimated amount for the duration of the subsequent contract: Maintenance for 81 equipment. maintenance of 136 equipment.

Estimated maximum value for a sub contractVAT: RON 1, 488, 000.

Frequency and value of the contracts to be awarded (if known): min. 3, max. 6.

Duration of the subsequent contract: the estimated duration is maximum 12 months from the signing of the subsequent contract. 1.

- DUAE - Single European Procurement Document under Art. 202 of Law 99 / 2016.

To be completed by the tenderers (as(1) The contracting entity accepts at the time of submitting the requests for participation or the DUAE (Unique Acquisition Document), which consists of the following documents: an up-to-date statement as preliminary evidence instead of his / her certificates(a) - i. - the tenderer, the associated tenderer, the subcontractor and the third party are not in any of the situations of exclusion provided for in art. 177, 178 and 180 of Law 99/2016; - the bidder, the associated bidder, the subcontractor and the third party are not in preferenceArt. 71 (b) meets the capacity criteria as requested by the contracting entity; (2) If the economic operator demonstrates that the criteria relating to the economic and financial situation or to the technical and professional capacity based on the capabilities of other entities, invoking, as the case may be, the support of a third party, The DUAE, together with the supportive commitment, must be completed separately by the third party (s). DUAE submitted by the third party / third party (s) will include all the information mentioned in paragraph (1) lit. a), as well as the information from par. (1) lit. b) and c) which are relevant for the support given in the respective award procedure;the economic operator intends to subcontract part / s of the contract, the DUAE also includes information on the part of the contract to be subcontracted and annexed to the subcontracting agreement. Subcontractors whose capabilities are based on the bidder / candidate must also complete the DUAE separately, including all the information mentioned in paragraph (1)lit. a), as well as those in par. (1) lit. b) and c) that are relevant from the point of view of the capacities of the subcontractors on which the tenderer / candidate is based in the respective award procedure. In the case of subcontractors on whose capacity the bidder / candidate is not based, the DUAE will only contain the information mentioned in paragraph (1) lit. a).

The framing in the pre-situationsseen in art. 177, 178, 180 of Law 99/2016 leads to the exclusion of the tenderer from the procedure applied for the award of the sectoral procurement contract.

We mention the following decision-makers within the SSE. M. N. regarding the organization, running and finalization of the award procedure:

1) Valentin Branescu, General Manager, S.D.E.E. Muntenia Nord SA; 2) Raluca FlorentinaDumitriu, General Services Division Manager, S.D.E.E. Muntenia Nord SA;

3) Ilie Marin, Network Development Division Director, S.D.E.E. Muntenia Nord S.A.;

4) Vasile Claudiu Tudose, Director Energy Management Division, S.D.E.E. Muntenia Nord S.A .;

5) Marius Raduta Petrescu, Network Operations Division Manager, S.D.E.E. Muntenia Nord S.A .;

6) Gabril Petre, Energy Services Division Director, S.D.E.E. Muntenia Nord S.A .;

7) Monica Borlovan, Head of Legal Department and General Control, S.D.E.E. Muntenia Nord S.A .;

8) Mariana Corneanu, Head of Purchasing & Logistics Department, S.D.E.E. Muntenia Nord S.A .;

9) Iliana Carmen Petrache, Head of Product and Service Acquisition Service, S.D.E.E. Muntenia Nord S.A .;

10) Eusebiu Rotaru, Director of DICT, S.D.E.E. Muntenia Nord S.A .;

11) Gabriel Bute, SOICT, S.D.E.E. Muntenia Nord S.A .;

12) Alexandra Marinescu, chief of SB & C, S.D.E.E. Muntenia Nord S.A .; 13) Ovidiu Manolescu, ICT specialist, S.D.E.E. Muntenia Nord S.A.;

14) Liliana Margarit, [...] details on www.e-licitatie.ro

Turnover: we request, according to art. 188 of Law 99/2016, with subsequent amendments and completions, fulfillment as a minimum requirement regarding the situationeconomic and financial: the average annual turnover for the most recent 3 available financial years (2015, 2016, 2017) must be equal to or above RON 1, 400, 000, with the economic operator presenting documents supporting the fulfillment of the requirement. For equivalence, the average annual RON / currency rate communicated by the NBR will be taken into consideration.

How to access the ds award: SICAP / SICAP

Module of awarding admissible bids with equal scores.

The award procedure is online. If 2 or more bids are ranked first, with equal scores, the tie will be made taking into account the score obtained by the rating factors, in descending order of their weight. If equality is maintained, the entity contractant has the right to request new financial proposals (via SEAP / SICAP) and the winning bid will be the one with the lowest financial proposal.

The prices will be calculated with a maximum of 2 decimal places.

The winners will be nominated by applying the criterion award: the best value-for-money ratio.

After the interim report on the classificationthe supporting documents shall be submitted at the request of the contracting entity, the supporting documents proving the fulfillment of the assumed by completing the DUAE by the tenderer ranked first in the intermediate rankings drawn up at the completion of the evaluation of the tenders.

If, following the actions undertaken by the contracting entity based on art. 205 par. (2) of Law 99/2016, I offerthe successful tenderer does not duly demonstrate that all the qualification criteria as specified in the DUAE are fully complied with.

The adjudicating entity may ask any tenderer, at any time during the course of the procedure, to deposit all or part of of the certificates and supporting documents required when requiredin order to ensure proper conduct of the procedure.

In order to be completed by interested economic operators, the DUAE electronic version is available as an on-line form at: https: //ec.europa.eu / growth / tools, databases / ESPD / filter


Internet address (URL): www.mnd.distributie-energie.ro

Documents

 Tender Notice