Procurement Summary
Country : Hungary
Summary : Contract notice: Industrial machinery
Deadline : 10 Aug 2018
Other Information
Notice Type : Tender
TOT Ref.No.: 24863900
Document Ref. No. : 295906-2018
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : FOGASKERÉKGYÁR KIVITELEZ?, GYÁRTÓ, FEJLESZT? KERESKEDELMI KORLÁTOLT FELEL?SSÉG? TÁRSASÁG
Office Name: FOGASKERÉKGYÁR Kivitelez?, Gyártó, Fejleszt? Kereskedelmi Korlátolt Felel?sség? Társaság
Address: Batthyány Utca 58.
Town: Budapest
Postal Code: 1015
Contact Point: Sándor Dénes
Phone: +36 12122148
Fax: +36 12135431
Hungary
Email :fogas@fogaskerekgyar.hu
URL :http://www.fogaskerekgyar.hu
Tender Details
Object of the contract
Industrial machinery
Description: Contract notice: Industrial machinery
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 42000000, 42000000, 42000000
CPV Description: Industrial machineries
Fogaskerekgyar Kft. Eskoezbeszerzese
Reference Number: EKR000309422018
Adasveteli szerződes
Main Site: 2890 Tata, Kocsi ut 1.
Objects to be purchased: 1 toothpicker
Name: CNC controlled profile toothpick type
Type: NILES ZE 800 or with Technical Specifications:
Workpiece data
Header up to 800 mm or greater
Module up to 20 mm or larger
Fogfeup to 45 or more
Maximum length 1000 mm or greater
Sulk (table load capacity) 2500 kg or more
Grip data
Tolerance accuracy: 4 class according to DIN 3962 or better (ie 3, 2 or 1)
Test data input, user interfaces
Minimal application coefficient limit: 185 mm or less
Maximum working coefficient limit: 350 mm-or greater
Maximum application coefficient limit: 60 mm or greater
Electrical execution requirement: 70 kVA or less
5 CNC driven axes:
- rotating table - radial gripping
- rotating rotary axis
- axial displacement
you can do the following:
- a toothpick for a toothpick with a toothpick - toothpick radius- In the case of an irrigation
- Toothbrush work
Excessively abrasive and working with CBN tester
Modifics: Evolvens and gingival modifier
Inset head:
- profiles
- Teeth whitening
- radial swelling
- Splitting teeth - delivery of the machine: delivery of the gauge to the delivery company, 2890, Tata, Kocsi ut 1. INCOTERMS2010 CIP paritason,
- the grip of the machine on the timer site: The grip includes the grip and the peripherals on the grip at the place where the joints are mounted, the joints are connected to the axle units of the uesem, the shafts are geometrically inverted and marked with a knob. The time delay of the beuezemeles time is 3x8 hours,
- probadarab coexistencee: Provision of time-consuming gears tooth-scrubbing and diving at the gepen
- 5 days (8hours / day) training instructor: 2 persons with a pharmacy experience with the experience and knowledge of dentist knowledge in the Ajanlatkerő site, in Hungarian or in English,
- besides the concrete type sign, the space station is also tested
The Gift Provider with the products specified in the Technical Offices also accepts one-stop shops in 321/2015. (X. 30.) Korm. The time limit is the nine months from the author descriptor.
The timer is the lowest in terms of time-(Section 76 (2) (a) of the Kbt.).
In the procedure, no economic operator may be present, subsectional, and may not be considered as a legitimate economic operator. Section 62 para. (1) to (2) of the Act.
The Provider shall be entitled to exclude from the list the economic operator for whom there is an exclusion criterion for the application of the justifications. Section 62 (The period of time specified in paragraph 1 (a), (b), (e), (h), (j), (l), (n) and (p) of paragraph 1 shall always be checked by the verifier of the non- it is appropriate to satisfy the appropriate test requirements and to exclude the exclusion of any excuse reasons not to be found in the kennel from the Provider for the submission of a certificate issued by the hostasagi acted in the past in the ECR electronically. In this case, the Beneficiary must make a statement on the validity of the validity document submitted in the course of the selection procedure.
The applicant shall, in his / her case, provide proof that the tender dossier does not belong to the one-off European tender dossier. Article 62 (1) and (2)desens power. (- 1 of the Government Decree 321/2015 (X. 30.)). According to Article 69 (4) of the Code, (X. 30.) Government Decree 8-16. As specified in Section I, shall not be liable for the Section 62 para. (1) to (2) of the Act. Article 67 (4) of the Statute shall declare that the Contractor shall not beplease contact us. Article 62 (1) and (2) of the Code of Civil Procedure. (X. 30.) Korm. Decree on the application of Article 15 para. (1) of the basic Regulation to the suitably validated sub-enterprise or body of the organization only the one-off European case lawsuit document shall be filed with the competent authority. Section 62, for the exclusion of the excluded grounds in question.
The Provider excludes from this rule the provider, the sub-contractor or the suitably accountable organization against whom a certain reason for the above has occurred.
Provider of this kind from the prudent rules of electronic co-procurement, see 424/2017. (XII.19.) Of the Government Order (hereinafter referred to as the Order of Government No. 424/2017 (XII.19))he will embrace him.
The admirer remembers that 424/2017. (6) of the Government Decree, only those economic operators who are registered in the EDF for the period of time provided for in Section 6 (6) of the Order of Government of the Republic of Croatia, are entitled to submit a copy of the documentary evidence of the breach of the contract., csutas javasThe documents may be submitted using the electronic form provided in the Electronic Carton Delivery System (hereinafter referred to as the "EDF") or, if the document is not available in the language of the declaration language, in the form of a simple electronic copy of the paper paper document. If the electron is related to the document in the EDFno declaration is attached to the declaration, as well as the documentary document provided by the EDF, with the highest degree of security in electronic form.
Provision is made for the provision of an electronic document certificate (guarantee declaration or handwriting declaration) on the basis of the applicable law must meet the-(the use of electronic evidence in the case of these documents).
The Trustee reminds us that where the Kbt. or a regulation of its execution, for a document requiring an impulsive smear, document 424/2017. (XII.19.) Electronic vendor according to the Government Decreeit is necessary to issue a certificate that is appropriate to the appropriate requirements and the exclusion of any exculpatory reasons can not be obtained from the Provider in order to provide a verifier that has been submitted to the EDR by electronic means by the same owner of the same co-tenderer. In this case, please indicate the most recent justification for the selection procedure.
The data of the suitability of the contractor and the validated mod:
The Kbt. Article 67 (1) of this Act shall, in the light of the appropriate requirements, apply to the declaration contained in the one-off European Deed Records Document. Timely enoughthe format of the form IV.
Appointment of the attendees who have been summoned to prove that they are justified according to the following, according to the suitability test.
P / 1
The verifier shall attach 321/2015. (X. 30.) Korm. On the basis of Article 19 (1) (a) of the Hungarian Civil Code, in the case of all the contemplative Penzi-n intentthe following statement is made:
- all the daughters have been guilty of guilty,
- guilty of the pennies,
- the pennies (ko) in the 24 months preceding the birthday of the fellair fucking how long it took to let it go when it started to work and when it started work). This is a suitable test method-shall not apply to all claims of the breach of contract, and to the abolished court. Section 65 (6) on the basis of the P / 1 suitability test is sufficient if the test engineer meets one of the requirements of the minimum requirements. As per Article 65 (6)(or persons) may meet the requirements of the Kbt. (7) to (11) of Section 65. If a time-consuming person is willing to meet the requirements of any suitable body (s) of any body or person, Pursuant to Article 65 para. (7) to (11). The ajayou have to pay a risk to your adversary, you have to pay a stakeout,
2. For the time being, According to Article 66 (6) (a) and (b), with the negative content, it is stated in - 3. The Kbt. Section 71 provides for the provision of a daily allowance for those who are willing to give up. The other features of the Hianypotlas are the coopersin documents.
4. The terms of Section III.1.2) and III.1.3) and their proofs of attestation are the most stringent for all qualifying requirements in the official list of Qualifying Lists of Certified Surveyors. The date must be attached to the date and the breaks of the ceremonial stand(s), or in the year 2006, Section 9, subordinate subordinate sub-sample is a simple masonry parcel.
6. Documentation can be demanding electronically on the EDF system.
7. The timekeeper has to declare that the attachment of the attached members of the affiliates has a copy of his / her notation of the nominee submitted to the cegbirosag.also in case of a positive content statement, the submitter must attach the simple non-disclosure material to the non-disclosed copy. In the case of non-garden currencies (in case of forint or eurority of the euro in the case of quoting foreign currency)currency exchange rates should be applied.
9. Forditas: in the meantime all certified documents and documents must be submitted in a responsible Hungarian translation.
10. Iranyado from coopersticked in 2015. CXLIII. toervens and editions of regulations
11. Iranyado Time: CET
12. Relevance to the content elements of the timeslists is as set out in the bookshops documents.
13. Ajanand he / she does not allow the winner (s) of the project manager (s) to be sent to the contractor in order to complete the contract. Adoption of periodic Utaz-si Tarsulas (consortia) is also acceptable. The other texts of the test date are contained in the enclosure documents. At the time, there is a reading roomof the Kb. (4) of the Act on the Rights of the Child. The Director of the ECR shall issue a copy of the reader sample in the form of an electronic form printed in the EDF, which the Provider shall check in the form of the electronic form. Responsible accreditation: Csaba Nyiri, registered trademark: 00289
17. The time is electronicIn case of a document enclosed in the EDF system, the document must be submitted in full, in an irrevocable (non-editable) form, if the document attached to the EDF does not comply with the 424/2017. (XII.19) The information requirements of the Government Order and the Order of the Performer can not be read or displayed, y, as if the submitter did not issue the excel document and the Kbt.
If the document attached to the EDF in the EDF is compliant with the requirements for the IT features of the time-reselling documents specified in the co-procurement documents but is not read and / or disseminatedcan be displayed, the Provider invites the Scheduler to the name of software that is available for readable and accessible time. Tenderer does not apply the Kb. Section 75 (2) (e) of this Article
Internet address (URL): http://www.fogaskerekgyar.hu
Documents
Tender Notice