Procurement Summary
Country : Austria
Summary : Contract notice: Hydro-electric plant construction work
Deadline : 04 Nov 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 37259733
Document Ref. No. : 492784-2019
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : ÖBB-INFRASTRUKTUR AKTIENGESELLSCHAFT
Office Name: ÖBB-Infrastruktur Aktiengesellschaft
Address: Praterstern 3
Town: Vienna
Postal Code: 1020
Contact Point: ÖBB-Infrastruktur AG/Stab Einkauf
Phone: +43 19300097-75434
Austria
Email :roland.irnberger@oebb.at
URL :www.oebb.at
Tender Details
Object of the contract
Hydro-electric plant construction work
Description: Contract notice: Hydro-electric plant construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45251120, 44161500, 45251120, 44161500
CPV Description: Hydro-electric plant construction work.
High-pressure pipeline.
Power plant Obervellach II / main construction including pressure piping
The planned plant KW Obervellach II consisting of three water tanks with a total of about 9.0 m / s, 9 km long stream water tunnel, a 0.6 km long storage tunnel with 40-60 000 m storage capacity, an approximately 2.3 km long pipelines togetherA small hydropower plant, 1.6 km long underground DN 1 800 (gravity), a distribution pipeline DN 1 200, a powerhouse with two machine sets with a total of 37 MW (el) power, an outdoor substation, a 145 m underwater channel and a compensation basin with 40-60, 000 m net capacity with subsequent buffered discharge of the drainage waterinto the Moell. The gross height of the plant is 488 m
Main Site: 9821 Obervellach
The planned plant KW Obervellach II consisting of three water tanks with a total of about 9.0 m / s volume of water, a 3.9 km long water tunnel, a 0.6 km long storage tunnels with 40-60 000 m storage capacity, an approximately 2.3 km long auxiliary line including its associated small hydroelectric power station, egga 1.6 km long underground pressure pipeline DN 1 800 (power descent), a distribution pipeline DN 1 200, a powerhouse with two machine sets with a total of 37 MW (el) power, an outdoor switchgear, a 145 m long underwater channel and a compensation basin with 40-60 000 m net capacity with subsequent buffered discharge of the drainage water into the Moell. The gross height of thePlant is 488 m
- see tender documents
Internet address (URL): www.oebb.at
Documents
Tender Notice