Procurement Summary
Country : Poland
Summary : Contract notice: Engineering design services
Deadline : 12 May 2020
Other Information
Notice Type : Tender
TOT Ref.No.: 42110972
Document Ref. No. : 165426-2020
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : POLSKA SPÓŁKA GAZOWNICTWA SP. Z O.O.
Office Name: Polska Spółka Gazownictwa Sp. z o.o.
Address: ul. Wojciecha Bandrowskiego 16
Town: Tarnów
Postal Code: 33-100
Contact Point: Piotr Arciszewski
Phone: +48 895383186
Poland
Email :piotr.arciszewski@psgaz.pl
URL :www.psgaz.pl
Tender Details
Object of the contract
Engineering design services
Description: Contract notice: Engineering design services
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 71320000, 71320000, 71320000
CPV Description: Engineering design services.
Development of project-estimate documentation for the construction of a Ś / c PE gas pipeline and 32 PE / c gas connections in Siedliska and mc. Ełk
Reference Number: 2020 / WF00 / WP-002515
Development of project-estimate documentation for the construction of a ś / c PE gas pipeline with a diameter of 180/125/63 mm and 32 PE gas connections with a diameter of 25 mm in m. Siedliska and Ełk broken down into stagesz o. 892.0 m and thirty-two medium pressure gas connections with PE, diameter dn 25 mm and length L 6.0 mb in accordance with the conditions of connection to the networkgas in Siedliska and Ełk divided into stages along with obtaining a map for design purposes.
Stage I Material scope:
• Medium pressure gas pipeline with PE dn 180 mm and length L 4, 520.0 mb
• Medium pressure gas pipeline with PE dn 63 mm and length L 742.0 mb
• Medium pressure gas connection made of PE dn 25 mm and length L 6.0 mb pcs. 29
Stage II Material scope:
• Medium pressure gas pipelinewith PE dn 180 mm and length L 1, 100.0 mb
• Medium pressure pipeline with PE dn 125 mm and length L 445.0 mb
• Medium pressure pipeline with PE dn 63 mm and length L 150.0 mb
• Connection gas pressure average pressure dn 25 mm and length L 6.0 m 3 pcs.
The Employer does not describe how to assess compliance with this condition.
The Employer does not describe how to assessthis condition.
1. The Contractor is excluded from the public procurement procedure in relation to which any of the circumstances referred to in art. 24 paragraph 1 point 12 23 (with the exception of Article 24 paragraph 1 point 13 letter d Article 133 paragraph 4 of the Public Procurement Law) and paragraph 5 item 1 8 of the Public Procurement Law
2) Item 8 of the ToR contains statements and documents that the Contractors are required to provide in order toconfirmation of the Contractor`s compliance with the conditions for participation in the procedure and demonstrating the absence of grounds for exclusion.
3) The Employer informs that it will carry out the procedure in accordance with art. 24aa of the Act, which means that the Employer will first evaluate the offers and then examine whether the Contractor whose offer has been assessed as the most advantageous, is not subject to exclusion and meets the conditions for participation in
4) If the Contractor evades the contract or fails to provide the required security on due performance of the contract, the Employer will examine whether it is not subject to exclusion and whether it meets the conditions for participation in the procedure. The Contractor who submitted the highest-rated offer among the remaining offers.
5) The Contractor shall attach to the offer the documents and statements indicated in point 12.4 of the ToR. RemainAll documents shall be submitted by the Contractor at the request of the Employer.
6) The offer together with attachments, including a single document, should be prepared and submitted under pain of nullity in an electronic form bearing a qualified electronic signature, via the PSG purchasing platform.
7) The Contractor, within 3 days of the date of posting on the website the information referred to in point 86 par. 5 uponds, provides the Employer with a declaration of belonging or not belonging to the same capital group as referred to in point 7.1.12. ToR (according to the template in Annex 5 to the ToR). Along with submitting the declaration, the Contractor may provide evidence that the links with another Contractor do not lead to a distortion of competition in the procurement procedure.
8) Contractor and / or Subcontractorca employs under the employment contract persons performing all administrative and office work related to the performance of the contract, the performance of which consists of performing work in the manner specified in art. 22 - 1 of the Act of 26.6.1974 Labor Code (Journal of Laws of 2019, item 1040, as amended).
9) Communication and exchange of information between the Employer and Contractors is carried out in Polish while maintainingin electronic form via the PSG purchasing platform.
Internet address (URL): www.psgaz.pl
Documents
Tender Notice