DEBRECEN MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Engineering design services. The project location is Hungary and the tender is closing on 29 Nov 2018. The tender notice number is 499251-2018, while the TOT Ref Number is 28406339. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Engineering design services

Deadline : 29 Nov 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 28406339

Document Ref. No. : 499251-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : DEBRECEN MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Debrecen Megyei Jogú Város Önkormányzata
Address: Piac utca 20.
Town: Debrecen
Postal Code: 4024
Contact Point: Dr. Paróczai Bernadett

Phone: +36 52511550
Fax: +36 52511552
Hungary
Email :papp.zoltan@ph.debrecen.hu
URL :http://www.debrecen.hu

Tender Details

Object of the contract
Engineering design services

Description: Contract notice: Engineering design services

Authority Type: Regional or local authority
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71320000, 71320000, 71320000
CPV Description: Engineering Design Services

Infrastructure-Developing Design Tasks

Reference Number: EKR000912152018

Debrecen's Nursing-Hosted Infrastructure-Developing Combined Approaches to Design Execution Projects

Main Site: 4024 Debrecen, Piac Street 20.

Debrecen County Jogu Varos 58/2018. (III 26) Government Decree (hereinafter referred to as the Regulation) 1stthe property of the North-West Economic Association. According to Section 1 (1) of the Decree, the significant importance of the Government from the economic point of view of the Government has been made by the six-member governments of the county government of the bourgeoisie. Concerning infrastructure improvements for teruelet TT-58/2018. there were plans for the plan, which were in the kožerverzesi dockNumbers are reset.

Design task boundary:

1. There is a need to prepare a roundabout with a six-knot and a queensite crossbreed with a six-knot and a queensite crossbreed on a plot of approximately 13.5 km long, along with a roundabout runway with 10, 000 miles long runway, and dashboard traffic simulators. second You have to gothe combined plans for the 21, 8 km open and closed borehole and inland water drainage system included in the layout drawings of the co-procurement documents. It is necessary to prepare the farms' landscaping sites for a total length of 20.4 km, with a waterfall of about 21.37 km long (nyomo / gravitacios) waste water-lepid execution plans.

4. It is necessary to have the permissible execution plans of the supply chain of the Commercial Halls with a high-speed cable. It is necessary to make the design plans of the skeletons of the skeleton that are due to technical difficulties.

6. Providing the designer with a mock-proof design.

The epithets will give you a chance• The design documentation must be delivered in 8 pieces of paper, 1 irradiated DVD, and 3 digitalis (pendrive) files. It is the responsibility of the developer to carry out the tasks of the authorizing officer. A rough and unreasonable test drive for the export design documentzuekseges to submit it.

The design documentation for the exporter has to include worksheets in the legal regulations. The design and layout design documentation must contain all the necessary work permits for the licensing and the execution.

The plans are in .pdf / A, .dwg and .pla format, and are available in .pdf / A formatted with a digital subdivision.The format and the digital formatting (size, resolution) must conform to those of the atadaskor 312/2012. In the 8 th anniversary of the Government Order, 306/2011. (XII.23.) And 191/2009. (IX.15.) Of the Government Decree, so that everything else ayou can enter the ETDR system into a cross-platform release. The co-driver should be machined with a quantity and quantity of samitas. You must complete the entire design document in an electronically editable format (pages, technical brochures, foundations, etc.).

Further information, detailed and complete technical content can be found in the otherInstinctual reinforcement experiments:

- Probation test: 2% of the net design in the solar system. The maximum length of the test is 15 days,

- Meghiusulasi koetber: 30% of the net design,

- Total test result: 5% of the net design / error rate. Hibas full-length koetber can be inflated up to 3 times,

- Pool: 24 months. What's the start time

Kizaro reasons: it is not possible to use a time-consuming, low-cost, and inexperienced way of doing the job verifiable by an economic operator, -against whom the Kbt. (1) - (2) of Section 62.

Article 74 (1) (b) of the Rules of Procedure provides for the exclusion of a time-maker, a sub-contractor or a suitably qualified organization from which the justifications are based on the above. / 2015th (X. 30.) Gov. Order(hereinafter referred to as VHR 321), as follows: i. in the following terms:

- the economic operator is prompted to submit a statement in the single European co-decision document in the absence of exclusionary grounds. (Section 67 (1) of the Kbt.), - if it is complied with by the capacity of the eligible body, -you will need to have the capacity available from your organization at the time. (Section 67 (3) of the Kbt.), - further the applicant shall declare that he or she fails to apply to the Contractor's Contractor, Section 62 (1) - (2) of the Exclusion Act (Section 67 (4) of the Kbt.). giveaway(Section 69 (4) of the Kbt.): - the time-holder must prove by virtue of -- 321, -- 8 and 10 and -- 12-16 of the VHR that he / she does not belong to the Kbt. (1) to (2) of Section 62.

The exclusionary reasons are not sufficient to justify the documents in a simple manner. For justificative reasons, it is validated before the start of the contract(can be used) as long as the contents of the certificate or data contained in the verdict are valid. To the contrary, until the proof of proof to the contrary, the data content of the light is recorded by the time-consuming party in the queue.: Paragraph 26 (3) of the VHR 321, in conjunction with the provisions of Article 322 (8) (1) of the VHR, by attaching a documentary copy of the relevant document in the relevant Chamber of Commerce of the relevant Chamber of Commerce. The full-time driving license for the trial will be examined by the time-consuming organization. (In the case of a non-Hungarian economic operator, the non-resident serin(1) of the VHR Article 321, paragraph 1 of the VHR, when the time-limit is submitted to the one-time European co-operative lawyer the document must state in advance that it is in compliance with the Kb. - 65 et seqyour father has the opportunity to apply for a suitable time. On the basis of Section 2 (5) of the VHR 321, a simple statement is accepted. Section VI, paragraph (4) of Section 69.

VI.3) Continuation of further information:

15.) The economic, technical and the qualitativein the examination of aspects of the contractual fulfillment of obligations, the Advisor concluded that the co-purchaser was unable to reconcile with the economic essentials as a result of the re-appointment of the buyer, and the planning tasks related to an investment project related to the infrastructure developer of the Debrecen East-West Economic Association, boif the design of a more intricate authoritative utterance with a better designer would be lost, the service would have a negative function and would lose a lot of time if the same design plan did not result in a complete design document and that would cause considerable damage. The inevitable part of the disaster relief plans is the pipeline drainage plans, which are equidistantit would not be unreasonable for the property to be solved in a cruel system on the unsettled system (which has a lot to do with the landscaping plans). It is also indispensable to make plans for the design of the cockpit, as it is challenging because of the design of the knotboats and roundabouts. The dirty, the ivovis water sprinklers didand in the finals of the aforementioned, there are so many cheeses that make it economically unmanageable to order from a designer. To run a full-fledged design project related to a project from a host, it is important to order the projector to avoid the co-ordination of jaro problems (which is not compatible with egit may lead to incompatible technical solutions), and the one-time joint liability of the individual may be ensured by an organization.

1. 71 of the Act. If, with Hianypotlass, the promoter enters a previously unlisted economic operator with regard to the operator and the operator concerned

2.) Appropriate terms and conditions as set out in Appendix III.1.3) and their verifiable modalities for the qualifying aspects of the official list of Qualified Time Listers are strictly enforced.

3.) The Provider Excludes the host organization is writing. Koezoes has a timely mention of the timeezoes must be accompanied by a validated copy of the minimum content contained in the contract documents.

4.) The date shall be submitted electronically in accordance with Section 5 (2) of Government Decree 424/2017 (XII.19.). The electronic submitter must have the complete time format electronically available (.jpeg or .pdf) in one or morein a file.

5.) A statement that is based on the sole purpose of applying a lawsuit (including a declaration of assurance or a declaration of assurance), an electronic document must comply with the protocols of the full authenticated self-testimony of the citizen's parental authority. .) Give the time-maker a statementthe Kb. Section 66 (6) (a) to (b).

7.) The time limit must include the express written statement of the prospective Bidder. 66 (2). The statement must be included in the original.

8.) If the periodic artist also determines the second most favorable offerer in the price of a pottery, then in the case of the winners of the first prize, (9).) The jury will not attempt to provide you with any information on the performance of the procedure.

10.) The bidder shall apply the Kbt. (4) and (5) of Section 81.

11.) Responsible Authority: Provider of the 322/2015. (X.30.) On the basis of Article 11 of the Order of the Order of the Orderthat the winning bidder must have a professional liability insurer for the entire duration of the contract, with a minimum limit of 50 millio / karatemeny and the lowest 100 millio / karev.

12.) The bidder does not apply the Kbt. Section 75 (2) (e).

13.) There are also a number of points of reference on the basis of the following: 0 pointst, the upper limit is 10 points. The scoring method is: Ar aspect and 2. qualitative aspect (scheduling time): translated articulation, 1.1, 1.2. es 1.3. aspect ratio: score, according to the documents of the buyer. References to sections 1.1, 1.2. es 1.3. In the case of special points of view, the same professional may also be presented by the timer.

According to the timing point of the pool, yat drafting design task 495 000 000 Ft afa oesszeget can not be fulfilled during the expiration of the deadline, therefore this date is not valid until the deadline has been published Kbt. Section 14 (1) (e) of Article 73.

14) In point II.2.7, the deadline for completion is to be paid in days. The time limit specified is the Scheduled Time Scheduler for the unified permissionthe date of completion of the contract is based on the terms of the contract and the content of the contract is subject to the provisions of point III.1.2.
Internet address (URL): http://www.debrecen.hu

Documents

 Tender Notice