Procurement Summary
Country : Finland
Summary : Contract notice: Electricity, heating, solar and nuclear energy
Deadline : 12 Nov 2018
Other Information
Notice Type : Tender
TOT Ref.No.: 27419206
Document Ref. No. : 435943-2018
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : SANSIA OY
Office Name: Sansia Oy
Address: PL 2000, Viestikatu 3
Town: Kuopio
Postal Code: 70600
Contact Point: Teemu Koponen
Phone: +358 447182900
Finland
Email :teemu.koponen@sansia.fi
URL :https://www.sansia.fi
Tender Details
Object of the contract
Electricity, heating, solar and nuclear energy
Description: Contract notice: Electricity, heating, solar and nuclear energy
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 09300000, 09300000
CPV Description:
Mainpage: Hingunniemi School Center, Hingunniementie 98, Kiuruvesi
The production of renewable energy source based on renewable energy source is based on the renewable energy source of energy from the Ylae-Savo educational districts of Hingunniemi.emoenergy production will be fixed by Ylae-Savo's training community in Hingunniemi School District for a 12-year contract period. The training community has owned and operated blade boiler installations at the end of its lifecycle operated by a private power producer.
Acquisition of a total purchase by the laempoeyrittaejae principle, in which valThe supplier is responsible for supplying and reconditioning the reconditioning of the reconditioning center equipment and for the production of the nuclear power plant for the whole period of the contract. Part of the existing facilities and facilities are hyoeditivissae, and lisaer building is possible if necessary. Network liability is the subscriber. The point of measurement of the propellant energy will come to the Laempo Center, and needit is purchased for the base price of EUR / mk of the measurement fee and EUR / MWh based on the energy fee. The annual energy requirement is 1 100-1 200 MWh and the peak power of the renewable equipment is 400 kW. 90% of lemmonenergy pitaeae is used to produce renewable energy based fuel. The production of spare energy comes into being and it must be located in the same cancerin the forecast with the pawl equipment. If necessary, spare energy can be generated by fuel based on non-renewable energy source, however, up to 10% of the total polymer energy.
The bidder is required for example. providing previous items of experience, conducting tests and maintenance. The price of energy purchased is based on the basic charge and the energy charge, the changes of which are boundto indexes. The supplier is selected on a total economic basis, emphasizing the cheapest total price during the contract period (maximum 80 points) and the security of supply (maximum 20 points). The acquisition does not apply to so-called " redemption price or a separate redemption price, and the contract will continue for a fixed period of 12 years for an indefinite period. Breakfast is a var
you can visit the property at the time of the offer. The remodeled london center must be well-received in the last week of 31.7.2019.
Taemae is a brief description of the purchase - the tenderer must take into account the offer, allot all the bids and requirements set out in the appendix.
Internet address (URL): https://www.sansia.fi
Documents
Tender Notice