Procurement Summary
Country : Ethiopia
Summary : Contract notice: EIB - Geothermal power plants and related installations
Deadline : 13 May 2020
Other Information
Notice Type : Tender
TOT Ref.No.: 42103443
Document Ref. No. : 162987-2020
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : TM GEOTHERMAL OPERATIONS PLC
Office Name: TM Geothermal Operations Plc
Town: Addis Ababa
Ethiopia
Tender Details
Object of the contract
EIB - Geothermal power plants and related installations
Description: Contract notice: EIB - Geothermal power plants and related installations
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Not specified
Document: Contract notice
Regulation: European Investment Bank, European Investment Fund, European Bank for Reconstruction and Development
Award criteria: Not specified
CPV code: 71356200,
CPV Description: Technical assistance services.
(hereinafter referred to as `the Borrower`), an Ethiopian private company, has applied for a loan from the European Investment Bank (`EIB` or the `Bank`) towards the cost of a Geothermal Power Project (the `Project`) with net output of 50 MW. This international invitation for tenders (`ITT`) relates to the pre-qualification of contractors to perform Engineer-Procure-Construct (`EPC`) services for this Ethiopian Project..
The EPC services will be centered on the provision of a turnkey, fully functional geothermal power plant and associated resource gathering system (`RGS`). Optional service offerings relating to operations and maintenance may also be considered and added to a forthcoming request for proposals (`RFP`) for EPC services. The RFP document will be sent to prequalified EPC contractors following the conclusion of the present ITT process..
The total scope of the contractor`s supply will be referred to as the `Works`. The Works will be executed under a firm price, guaranteed completion date EPC contract. The Works shall provide a minimum net electrical output of 50 MW measured at the electrical revenue meter located on the high side of the step-up transformer. The measured output shall be considered as a `net` output at design point conditions and include all parasitic loads required to operate the plant and the RGS. All relevant technical and other specifications will be provided in the RFP..
The EPC contract is expected to be implemented from December 2020 to February 2023, for Phase 1 (50MW). A future Phase 2 (an additional 100 MW) is being implemented with a schedule lag of 12 months..
The criteria used in the present pre-qualification evaluation are:.
— EPC Power Plant Projects (in last 10 years), .
— OEM turbine supply geothermal turbines, .
— EPC power plant projects using condensing steam technology, .
— engineering provider experience (in last 10 years), .
— EPC experience in Sub-Saharan Africa, .
— EPC experience using IFC and/or International ES&H Standards, .
— EPC contractor net worth, .
— EPC contractor annual turnover..
The complete pre-qualification document may be obtained free of charge by contacting Ms. Hayat Seid (see below)..
All eligible firms are invited to participate in the pre-qualification process..
All pre-qualification responses must be e-mailed in in a file no larger than 15 MB. If the submittal is larger than 15 MB, the file shall be electronically transmitted via Bidder`s own file transfer system to:.
Ms. Hayat Seid, Chief Commercial Officer, h.seid@tmgeothermal.com.
Copy: Mr. Yitemgeta Fantu Golla, Deputy Chief Technical Officer, y.golla@tmgeothermal.com.
Other kind of submittals, such as oral or faxed submittals will not be accepted..
Bidder submissions must be received by e-mail no later than 17.00 East Africa Time on 13 May 2020. Late responses will not be considered..
Internet address (URL):
Documents
Tender Notice