„??? ????????????? ????????“ ?? has floated a tender for Contract notice: Construction work for electricity power lines. The project location is Bulgaria and the tender is closing on 22 Nov 2018. The tender notice number is 457494-2018, while the TOT Ref Number is 27794976. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Bulgaria

Summary : Contract notice: Construction work for electricity power lines

Deadline : 22 Nov 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 27794976

Document Ref. No. : 457494-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : „??? ????????????? ????????“ ??
Office Name: „??? ????????????? ????????“ ??
Address: ???. „??????????? ????“ ? 159, ???????? ?????? ??????
Town: Sofia
Postal Code: 1784
Contact Point: ??????? ????????

Phone: +359 28958976
Fax: +359 28272171/ +359 28270332
Bulgaria
Email :mariana.stoicheva@cez.bg
URL :www.cez-rp.bg

Tender Details

Object of the contract
Construction work for electricity power lines

Description: Contract notice: Construction work for electricity power lines

Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 45231400, 45231400, 45231400
CPV Description: Demolition of 17 old 110 kV MMO 110/1250/20 Y1 circuit breakers and installation of 17 new 110 kV ABB LTB 145D1 / B switchgear in distribution substations of CEZ Distribution

Reference Number : РРС 18-111

"CEZ Distribution BULGARIA" AD conducts an open procedure with the object "Dismantling of 17 old 110 kV circuit breakers MMO 110/1250/20 Y1 and minstallation of new 17 110 kV ABB LTB 145D1 / B elastic circuit breakers in distribution substations of "CEZ Distribution BULGARIA" AD, ref. No. РРС 18-111.

Main Site: Distributive substations owned by CEZ Distribution BULGARIA PLC located in the territory of Sofia

The order includes a stepwise replacement of oil-filled circuit breakers 110 kV MMO 110/1250/20 with new elegans circuit breakers 110 kV ABB LTB 145D1 / B in distribution substations owned by "CEZ Distribution BULGARIA" JSC located in the territory of Sofia The interrupters will be replaced in succession in pre-coordinated objects (linear connections in specific substations). Circuit breakers should be executed according to the manufacturer's requirements and instructions of the elasticsThe subject of the order includes the following main activities for a switch:

- Dismantling of an existing 110 kV MMO 110/1250/20 switch in a particular energy object (substation),

- Transport of the disconnected switch to a warehouse of the assignor of the territory of the city of Sofia,

- Dismantling of an existing foundation,

- Construction of a new foundation on a project provided by the assignor,

--Transport of a new 110 kV ABB LTB 145D1 / B switchgear from the warehouse of the client at 32 Gintsi Street in Sofia to a specific distribution substation (on the territory of Sofia), - Installation and commissioning of a new circuit breaker 110 kV ABB LTB 145D1 / B (according to the manufacturer's requirements annexed to the technical requirements), including filling with elastics, - -the outage circuit breaker according to the requirements of the manufacturer's plant and Ordinance No. 3 of 9.6.2004 on the electrical equipment and wiring (NWUW),

- Check before commissioning (according to the manufacturer's requirements, attached to the technical requirements) Carrying out functional samples,

- Issuing a protocol for successfully conducted pretest tests by otori- For carrying out the performance of the subject of the contract, the assignor shall draw up an award document (s) containing at least the following information: substation and field for replacing a breaker, the types of work, the quantity, the execution time, the price on the basis of unit prices from the contract and anotherinformation necessary for the implementation of the types of activities. The acceptance of the work on the assignment document shall be certified by a protocol of acceptance signed by the parties to the contract in the manner and in the manner described in the contract.

The construction and assembly activities for each field (line connection) will be started after the available equipment site for the respective volume of activities (number ofIn case of inconsistencies / defects with newly assembled equipment in the course of the 72-hour functional samples under voltage and load, the responsibility for the complete removal is performed by the contractor at his own expense. all the materials necessary for the execution of the order, including all necessary technical means related to pthe easy installation and commissioning of the new circuit breakers, except the circuit breakers themselves, are the responsibility of the selected contractor. The Assignor provides the new 110 kV ABB LTB 145D1 / B 110 kV circuit breakers with the fasteners and the support base from their warehouse in Sofia. All transport and organizational costs for the delivery of materials upon completionincluding the transportation of the new switchgear from the customer's warehouse to the specific workstation (substation), as well as for removal of the dismantled materials and cleaning of the construction site, are at the expense of the contractor

The replacement period of 1 elasticized switch is up to 25 days from the date of the award document.

The participant should be registered with the Central Professionalthe Register of the builder to the Bulgarian Construction Chamber for the third group - constructions from the energy infrastructure according to Art. 5, para. 1, item 3 of the PITVPPC for construction of at least the second category according to Art. 5, para. If the participant is a non-resident, it should be entered in a similar register under the law of the Member State in which it is established.-this selection criterion is to be found in EEDOP, Part IV: "Selection Criteria", Section A: "Fitness".

Proof of the circumstances listed in EEDOP are presented under the procedure of Art. 67, para. 5 and para. 6 of the Public Procurement Act, as follows:

- In the cases under Art. 67, para. 5 of the Public Procurement Act to prove the circumstance declared in EEDOP, the participant shall submit a copy of a certificate for entry in the CPSC, accompanied by a coupon, by whichit shall be valid and, if the tenderer is a foreign person, he shall produce a copy of a document proving his entry in a similar register under the law of the Member State in which he is established; 67, para. 6 of the Public Procurement Act to prove the circumstance declared in EEDOP, the participant shall submit a copy of a certificate for entry in the CPRS accompanied by a fee(s), which show its validity

Not required - Continued from section III.1.6) "Required deposits and guarantees": - or - bank guarantee (original) irrevocable, unconditional issued by a bank to the benefit of the contracting authority "CEZ Distribution BULGARIA" JSC, with terms of utilization coinciding with those of the template in the documentation and with a term of validity of at least 39 (thirty-nine months) from the date of andThe date of issue may not precede the date of the contracting entity's invitation to the selected contractor for the award of the public procurement contract,

or

- insurance which provides for performance by covering the contractor's liability and meets the requirements specified in the documentation. Where the performance guarantee is in the form of a cash payment or a bank guarantee, it may-to be provided on behalf of the contractor on behalf of a third party guarantor The participant designated as a contractor shall choose the form of the performance guarantee itself ..

When the selected contractor is a grouping which is not a legal entity, each of its members may is the order of the bank guarantee, respectively the importer of the amount under the guarantee or the insurance policy holder

The terms and conditions for-retention, utilization or release of the performance guarantee are governed by the public procurement contract.

Continued from section III.1.3) "Technical and professional opportunities."

The information on this selection criterion is to be found in Part IV, Section D of EEDOP, and if the certificate information is not provided free of charge, the certificate, scope and duration of the certificate

Under the terms of Art. 67, para. 5 and para. 6 of the Public Procurement Act, a certified copy of a valid certificate certifying compliance of the participant with a quality management standard BDS EN ISO 9001: 2008 or BDS EN ISO 9001: 2015, or equivalent, with scope (scope of activity), relevant to the subject of the order
Internet address (URL): www.cez-rp.bg