POLSKIE KOLEJE PA?STWOWE S.A. has floated a tender for Contract notice: Construction work for buildings relating to railway transport. The project location is Poland and the tender is closing on 28 Aug 2018. The tender notice number is 316816-2018, while the TOT Ref Number is 25194331. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Poland

Summary : Contract notice: Construction work for buildings relating to railway transport

Deadline : 28 Aug 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25194331

Document Ref. No. : 316816-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : POLSKIE KOLEJE PA?STWOWE S.A.
Office Name: Polskie Koleje Pa?stwowe S.A.
Address: Al. Jerozolimskie 142 A
Town: Warsaw
Postal Code: 02-305
Contact Point: PKP S.A. Centrala, Biuro Zakupów, Al. Jerozolimskie 142 A, 02-305 Warszawa

Phone: +48 224749282

Poland
Email :przetargi@pkp.pl
URL :www.pkpsa.pl

Tender Details

Object of the contract
Construction work for buildings relating to railway transport

Description: Contract notice: Construction work for buildings relating to railway transport

Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 45213320, 45000000, 45110000, 45111200, 45220000, 45310000, 45311100, 45312100, 45312200, 45312310, 45343000, 45422100, 45443000, 45450000, 45453000, 45233140, 45330000, 45314000, 71240000, 71320000, 45311200, 45331100, 45331211, 45332000, 45333000, 45400000, 31000000, 32000000, 45233200, 45112700, 45213320, 45000000, 45110000, 45111200, 45220000, 45310000, 45311100, 45312100, 45312200, 45312310, 45343000, 45422100, 45443000, 45450000, 45453000, 45233140, 45330000, 45314000, 71240000, 71320000, 45311200, 45331100, 45331211, 45332000, 45333000, 45400000, 31000000, 32000000, 45233200, 45112700
CPV Description: Construction work for buildings relating to railway transport.

Construction work.

Building demolition and wrecking work and earthmoving work.

Site preparation and clearance work.

Engineering works and construction works.

Electrical installation work.

Electrical wiring work.

Fire-alarm system installation work.

Burglar-alarm system installation work.

Lightning-protection works.

Fire-prevention installation works.

Woodwork.

Facade work.

Other building completion work.

Overhaul and refurbishment work.

Roadworks.

Plumbing and sanitary works.

Installation of telecommunications equipment.

Architectural, engineering and planning services.

Engineering design services.

Electrical fitting work.

Central-heating installation work.

Outdoor ventilation installation work.

Plumbing and drain-laying work.

Gas-fitting installation work.

Building completion work.

Electrical machinery, apparatus, equipment and consumables; lighting.

Radio, television, communication, telecommunication and related equipment.

Various surface works.

Landscaping work.

Budowa dworca kolejowego Bielsk Podlaski

Reference Number : KIZ/2018/WNP-008397/2

Przedmiot zamowienia:

Main Site : Bielsk Podlaski

1. Opis przedmiotu zamowiions (OPZ), constitutes Appendix No. 2 to the Terms of Reference (includes the construction design, detailed design, technical specifications of the performance and acceptance of the robot, the robot, construction permit) and Annex 2A to the ToR (Functional-Utility Program). The Employer emphasizes that according to the description contained in the description of the subject of the order, all works included in the scope of the order should be made compliantNot with project documentation, technical specification of performance and acceptance of construction works, guidelines of the Employer, recommendations and decisions issued as well as legal regulations and standards. The orderer adds that the robot's sub-size has an auxiliary character and does not constitute a closed catalog of the robot's description.

2. The Contractor is obliged to fulfill the order on terms and conditions specified in the templateAgreements - Annex No. 9 to the ToR and description of the subject of the order (OPZ) Annex No. 2 to the ToR and Annex No. 2A (PFU) to SIWZ 9 to the ToR and description of the subject of the order (OPZ) Annex No. 2 to the ToR and Annex No. 2A to Terms of Reference.

3. The contractor or subcontractor is obliged to employ persons performing work within the meaning of art. 22 - 1 of the Act of 26.6.1974. Labor Code (Journal of Laws of 2016, item 1666, as amended). The employment obligation applies to employees who, under the Contract, which will be concluded as a result of the subject matter of the contract, will perform the following tasks: 1) masonry, painting, roofing, activities as a bricklayer assistant,

2) assemblers in the field of sanitary installations,

3) montein the field of electrical and teletechnical installations,

4) accounting and maintenance of construction documentation.

4. The requirement of employment under a contract of employment does not apply to persons performing other work areas, in particular: developing design documentation, construction managers, providing geodetic services, and building material suppliers.

5. Specific rules, conditions and sanctions dfence. employment under a contract of employment, are specified in Chapter III of the ToR.

6. The contracting authority provides for the award of contracts referred to in Article 67 sec. 1 point 6) of the Public Procurement Law, in the period of 3 years from the date of awarding the basic order, the previous contractor of the construction works, consisting in the return of similar services and construction works as in the basic contract and compliant with its orderobject, and the total value of these orders was included in the calculation of its value.

7. The sum of the above orders will not exceed 20% of the value of the basic order.

8. The Contracting Authority allows the subcontractors to entrust the execution of some orders to subcontractors.

9. The Contractor is obliged to indicate in the document JEDZ, constituting Annex 3 to the ToR, parts of the orders, whichit intends to entrust subcontractors with subcontractors and provide subcontractors (if known at the current stage).

10. The orderer does not plan to organize a vision of a local building with his participation. It is recommended to inspect the building object on its own.

Attention! Due to the lack of the possibility of including more information, the information containedthey are in SIWZ posted on the Purchase Platform - "Platform" or "System" at the address: https: // pkp.eb2b.com.pl and the website http://pkpsa.pl/pkpsa/przetarg/przetargi.html.

Zamawiający does not set specific requirements to meet this condition

1. The Ordering Party considers the condition to be fulfilled if the Contractor demonstrates that he: has the financial resources or the creditworthiness to takeliabilities in the amount not less than PLN 1 500 000.00 (in words: one million five hundred thousand zlotys 00/100).

2. In the event of submission by Contractors of any documents containing financial data in currencies other than PLN, the Employer as the currency conversion rate will accept the average exchange rate of the National Bank of Poland (NBP) in force on the date of publication of the contract notice in the Official Journal ofin the European Union, and if no such exchange rate was announced on that day, the average NBP exchange rate announced for the given currency on the first day preceding the publication date of the contract notice in the Official Journal of the European Union will apply. they are not subject to exclusion from the proceedings based on art. 24 sec. 1 and arvol. 24 para. 5 points 1), 2), 4) and 8) Public Procurement Laws

2. The list of statements or documents confirming compliance with the conditions of participation in the proceedings and the lack of grounds for exclusion is contained in chapter X of the Terms of Reference. Contractors jointly applying for the award of a contract (Consortium, partners of civil partnerships) conditions of participation in the proceedings can meet jointly. None of the Contractors appearing jointlye may be subject to exclusion pursuant to art. 24 sec. 1 and par. 5 points 1), 2), 4) and 8) Public Procurement Law

3. The Contractor shall enclose up to date the offer valid for the day of submitting bids in the following scope: Part II sections AD, Part III sections AD, Part IV section α (Contractor may confine itself to completing the α section in Part IV and does not have to complete any of the other sections in Part IV) Part VI. informations included in the statement constitute preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the proceedings.

4. Statement, referred to in point. 3 (above), the Contractor shall submit in the form of a single European order document "EAT", prepared in accordance with the specimen standard form defined in the EC Commission's implementing regulationE) 2016/7 of 5.1.2016, issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU and art. 80 ust. 3 of Directive 2014/25 / EU, the model of which is Annex No. 3 to the ToR.

5. The Ordering Party, pursuant to Article 24 aa paragraph 1 of the Public Procurement Law, provides for the possibility of assessing tenders in the first place, and then to examine whether the Contractor, whose the offer has been assessed as the most advantageous, not subject to youkey and fulfills the conditions for participation in the proceedings.

6. According to art. 26 par. 1 of the Public Procurement Law, the Contractor, at the request of the Employer, will submit the documents referred to in the Chapter of the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the Employer may request from the contractor in the proceedings for the award of - 2 para. 2 points 3) - info. bank or jump; - 2 para. 4 point 1) list-construction works, - 2 section 4 point 2) list of services, -2 para. 4 point 10) list of persons and -5 points 1) -6) and 9) in the case of foreign entities, respectively, documents from -7, -8 of the Regulation.

7 In the case of joint application by the Contractors, EAT shall submit each of the Contractors applying for for ordering. EAT should confirm fulfillment of the conditions for participation in the proceedings, and the lack of basicand exclusion to the extent that each of the Contractors demonstrates compliance with the conditions of participation and no grounds for exclusion. 8. A contractor who relies on the resources of other entities to demonstrate the absence of grounds for exclusion and compliance with them, to the extent that they are appointed to their resources, the conditions for participation in the proceedings are also submitted by EJ regarding these entities.

9. By ordery demands from the Contractor, which relies on the abilities or situation of other entities under the terms of art. 22a of the Public Procurement Law, present documents in relation to these entities, referred to in Chapter X, para. 7 point 2) SIWZ.

10.Zamawiający allows the possibility of entrusting the execution of a part of the orders to subcontractors. The contractor is obliged to indicate in a single document, part of the Orderand, whose performance it intends to entrust subcontractors and give their names.

11.The date of order completion, period on days 336 = 48 weeks.

12. The term in Section IV.2.6 of the announcement The minimum period in which the Contractor will be bound by the offer is 3 months = 90 days.

13. Other information is included in the ToR provided on the Employer's website http://pkpsa.pl/pkpsa/przetarg/przetargi.html


Internet address (URL): www.pkpsa.pl

Documents

 Tender Notice