WATERSCHAP RIVIERENLAND has floated a tender for Contract notice: Construction work. The project location is Netherlands and the tender is closing on 28 Sep 2018. The tender notice number is 319339-2018, while the TOT Ref Number is 25243137. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Netherlands

Summary : Contract notice: Construction work

Deadline : 28 Sep 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25243137

Document Ref. No. : 319339-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : WATERSCHAP RIVIERENLAND
Office Name: Waterschap Rivierenland
Address: de Blomboogerd 1 te Tiel
Town: Tiel
Postal Code: 4003 BX
Contact Point: mw. M.G. van Os

Phone: +31 344649813

Netherlands
Email :r.van.os@wsrl.nl
URL :http://www.wsrl.nl

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 51000000, 09300000, 09330000, 09331000, 09332000, 45000000, 51000000, 09300000, 09330000, 09331000, 09332000
CPV Description: Construction work.

Installation services (except software)

Electricity, heating, solar and nuclear energy

Solar energy

Solar panels

Solar installation

Construction of the Arnhem park

Reference Number: 2018061587

Solar Park Arnhem

Main Site: Arnhem

Project description:

- Design of the solar installations,

- Setting up the site where the solar installation was installedd must be,

- Supply of inverters and cabling (DC and AC),

- Supply of a construction for the installation of the solar panels and inverters,

- Installation and installation of the solar panels,

- Placement and installation of the inverters,

- Delivery, installation and installation of a monitoring system that is linked to the portal of the

Supplier of the inverters and the Central Control Kamer (CRK) of Water Board Rivierenland;

- Construction of the electrical installation required for the solar panels, including connection to the

Transformer or the LS distribution system;

- Testing the solar installations,

- All other activities arising from the above components, such that a working solar

energy system can be delivered;

- complete deliveryreporting, including instruction manuals, drawings, engineering data and

Documents;

- Guarantee on the solar panels with associated technical installations for a certain period of use;

- Delivery and installation of fencing (optional);

- Drafting maintenance plan for 15 years (optional)

The Tendering Department excludes tenderers from participating in this tender that are located ione or more of the circumstances stated in the Public Procurement Act 2016, in articles 2.86, 2.87 and 2.89. The tenderer must submit the "Uniform European Tender Document (UEA)" in Annex 1 to the tender. By signing this self-declaration, the Tenderer indicates that the circumstances as stated in this UEA do not apply to his company. TheThe Tenderer must provide the relevant supporting documents / declarations as referred to in Article 2.89 of the 2016 Tendering Act at the request of the Contracting Entity within 7 calendar days.

Quality Assurance

You must have a working quality system for your organization based on or equivalent to the ISO. -9001. Based on this quality system, a project can be speci fi ca quality plan for the construction of the Arnhem sun park. The burden of proof for this is done by submitting a copy of a valid certificate (NEN ISO 9001), which has been prepared by a recognized body or by handing over a copy of the table of contents of the quality system that you use.

In case of registration as a combination, the ccombination as a whole or one of the combinants to have a working quality system for the own organization based on or equivalent to the ISO-9001.

Safety assurance

You must have a safety management system at registration. The burden of proof for this is done by submitting a copy of a valid certificate (for example VCA *), which sees to itp the nature of the work, which has been drawn up by a recognized body.

The tenderer must be registered in the trade register or professional register, in accordance with the regulations in force in the Member State of origin. The Tenderer must be able to show this by an extract from the Commercial Register (not older than 6 months prior to the date of Tender) with his Tender.-

5.3 Suitability requirements

The suitability requirements as referred to in Part IV of the Uniform European Tendering Document (UEA) are listed below. By signing the "UEA" (Appendix 1), the candidate declares that he / she satisfies the suitability requirements.

See tendering instructions

Questions for clarification of this invitation to tender must be submitted no later than on the date indicated in the schedule.hour to be submitted via the electronic contracting system Negometrix

The questions must accurately indicate to which part (article and page number) of the descriptive document the question relates

Second round of information about answers given

During the second round of information you can only ask questions about the answers that Waterschap Rivierenland hast given during the 1st memorandum of information. New questions about the tender are not answered. Questions to clarify the answers given must be submitted no later than 12:00 on the date stated in the planning via the electronic contracting system Negometrix. The questions must accurately state the answer to which the question relates.inspection)

An indication and explanation will be organized on the date mentioned in the planning. Interested parties should register for the designation by sending a message to the Rivierenland Water Board via the message module in Negometrix.

During this designation, the relevant locations for the project will be visited and an explanation of the assignment will be given.already ready for the construction of Zonnepark Arnhem. In September / October 2018, the current waterway will be partially subdued and diverted. In addition, a part of the trees is cut down and the site is leveled. The design gives an impression of the location and the connection to the existing transformer.

Questions from the participants must be addressed via Negometrix by means of the question and answer.order module. Questions that are answered during the viewing and are not made via Negometrix have no legal validity. Sign up for the chimney


Internet address (URL): http://www.wsrl.nl

Documents

 Tender Notice