ÚSTECKÝ KRAJ has floated a tender for Contract notice: Bridge-design services. The project location is Czech Republic and the tender is closing on 25 Mar 2019. The tender notice number is 083417-2019, while the TOT Ref Number is 30914165. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Czech Republic

Summary : Contract notice: Bridge-design services

Deadline : 25 Mar 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 30914165

Document Ref. No. : 083417-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ÚSTECKÝ KRAJ
Office Name: Ústecký kraj
Address: Velká Hradební 3118/48
Town: Ústí nad Labem
Postal Code: 400 02
Contact Point: Bc. Martina Nováková

Phone: +420 475657325

Czech Republic
Email :novakova.m@kr-ustecky.cz
URL :http://www.kr-ustecky.cz/

Tender Details

Object of the contract
Bridge-design services

Description: Contract notice: Bridge-design services

Authority Type: Regional or local authority
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71322300, 71322300, 71251000, 71242000, 71248000, 71320000, 71322300, 71251000, 71242000, 71248000, 71320000
CPV Description: Bridge-design services

Architectural and building-surveying services

Project and design preparation, estimation of costs

Supervision of project and documentation

Engineering design services

Reconstruction of bridge buildings Trnovany ČD, Trnovany Blšanka and Tvršice PD,

Subject of fulfillment of the 1st and 2nd part of the public procurement is the elaboration of the project documentation and ID in the DSP, DPS level at the event:

Main Site: Ustecky kraj

This is the reconstruction of the bridge ev. No. 225-008 on road II / 225 in the village Trnovany. One is a 7-bay bridge with a length of 208.72 m bridged over the ČD, MK and 2x Ostrava stream with the year of construction according to the Bridge Act 1988. In the frame of the building should be replaced the subsurface MZ above OP1 and OP8, treated or replaced bearings . the adjustments of the storey thresholds, the overall reconstruction of the walkway and the height of the walkwayisolation, remediation of damaged and degraded parts of the structure, supports and wings by tapping water, replacement of barrier barrier. The Cil state should ensure that the detected boot is removed. One of them is mainly the prevention of delays in the construction bridge and the degradation of the deformation processes of the supporting structure, the supports and bridge wings, the underground MZ protections, the sidewalk of the bitumen bridge showing unevennesswith the cracks, the bearings are heavily corroded with locally damaged blocks, the concrete is degraded with surface decay, the barrier barrier shows corrosion and the locks are mechanically damaged, the NK concrete and especially the supports and the bridge wings are degraded in surface destruction, locally and disintegrated.

The goal of the reconstruction is to prevent further destruction of the bridge construction and further reduction in load capacitythe bridge of its bridge, the closure of a very poor technical condition and the increase of the load bearing capacity.

Required loadability of the above-mentioned bridge after its reconstruction is according to ČSN 736220 for load class I (A) Vn (normal loadability for all vehicles) 32t. orders:

Basic eligibility - according to the provisions of Section 74, paragraphs 1 to 3 of the Act, proves the participant of thepursuant to the provisions of Section 75 of the Act, professional competence, - according to the provisions of Section 77 (1) of the Act, the participant of the Entry Management System proves by documenting the Commercial Register or other similarly a record, if another legal regulation entered into such registration requires, Article 77 (2) (a) the law proves the participant of the inves tigation by a document proving the right to act in the extent to whichthe subject of the public procurement, if other legal regulations require such a correction, namely the trade with "Project activity in the construction".

Together for all parts of the order:

The contracting authority states that it requires the submission of the offer only in electronic form! exceed 200 MB, including a maximum of 100 MB of proofing documents and a maximum of 100 MB of other d

The offer must be processed in acceptable file formats, ie * DOC, * DOCX, * RTF, * XLS, * XLSX or * PDF (best in the version supporting fulltext search)

Submitter details the offer submission electronic form:

For the submission of quotes in electronic form will be used the certified Tender Arena electronic tool available on internet adrese profile of the advertiser

https: //www.egordion.cz/nabidkaGORDION/profilUsteckykraj



at www.tenderarena.cz, where you can also find detailed instructions on how to use it (the "help" link in Zapati) and the contacts for user support.

According to the above information, the Entrant Entrant should have a personal computer for the submission of queries, with at least the following performance: CPU frequency of 1 GHz, ope1024 MB RAM, 20 GB hard disk, personal computer must be connected to the Internet at a minimum speed of 2 Mbps (Download) / 512 Kbps (upload), the entrant should also have an Internet browser installed Microsoft Internet Explorer version 9.0 or higher, Mozilla Firefox version 30.0 and above) that has installed Java SW version 1.8 and higher.

UčastIn order to qualify for the offer, the tenderer must be registered as a supplier in the Tender Arena (link "supplier's registration" on the website www.tenderarena.cz) and the supplier's user must have the role of "bidder" for bidders. The registration process lasts up to 48 hours (on working days) according to the information given on the web site, upon proof of all requestsdocuments. Registration is not charged.

The Contracting Authority is not responsible for the technical conditions on the part of the Entrant Entrant. The sponsor recommends to entrants to take into account especially the speed of their Internet connection when submitting a quote so that they are submitted within the deadline for submitting offers (by submitting a quote, the final quote is sent to the tool after uploading all theIf the supplier chooses to bid on more than one part of the order, he / she is required to bid separately for each part of the order separately.

More information is provided in the enclosed documentation.
Internet address (URL): http://www.kr-ustecky.cz/

Documents

 Tender Notice