Procurement Summary
Country : Finland
Summary : Contract notice: Architectural, construction, engineering and inspection services
Deadline : 18 Jun 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 33096316
Document Ref. No. : 232185-2019
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : MESTARITOIMINTA OY
Office Name: Mestaritoiminta Oy
Address: Mannilantie 43
Town: Järvenpää
Postal Code: 04400
Contact Point: Antti Nikkanen
Phone: +358 409222007
Finland
Email :antti.nikkanen@mestaritoiminta.fi
URL :http://www.mestaritoiminta.fi
Tender Details
Object of the contract
Architectural, construction, engineering and inspection services
Description: Contract notice: Architectural, construction, engineering and inspection services
Authority Type: Other
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71000000, 71320000, 71000000, 71320000
CPV Description:
Engineering design services.
Harjula School New Building and B Wing Home Improvement, sawmill design
Mestaritoiminta Oy builds a new building at Harjula School in Jaervenpaea, Harjula School, which will function as a 3-series elementary school and pre-school. The school was demolished in the 1960s and 1980sulaajennukset. The original B-part of the 1930s is basically repaired by the 4-ganged limestone home. A plot plan change is being initiated on the site, where part B is protected by a town plan. The size of the new building is approximately 4, 900 brm and the size of the building to be renovated is 1, 090 brm. According to the investment proposal, the estimated cost of the new project is approximately EUR 16.5 million. EUR (VAT 0%) and project to be upgradedestimated cost of approx. EUR (VAT 0%).
Main Site: Verkkotie 12
Acquisition of the site's sawmill design. The goal of the subscriber is to create a partnership-based development model for excellent performance rewards. In the project, a milestone, or milestone target model, is being used. The assessment is based on the success of the entire planning team. The prerequisite is that you do not get everyonen designers are committed to a similar procedure. The design factory outlet will include the factory casts with its appendices and its appendixes in the special invitation to tender, in accordance with section 120c-e of the Land Surveillance and Building Act.
The project is in the planning task for the eligibility requirements (http://www.xn--shksituals.com/hp40/en/data/uploads/pdf/support/development_frequency_table.pdf and http: //www.xn--shksvezittelu-5hb40a.fi/data/uploads/pdf/kelpoisuushipsimukset_taulukko.pdf)
for renovation: conventional (sawmill system upgraded with conventional technology) .
Provider collects and designates a design team with a responsible sawa weaver designer and a sawmill designer, and marrying deputies. Responsible sawmill planner for new construction is responsible for coordinating new construction and refurbishment systems and equipment with sawmill design. The building as a whole is designed with data modeling. The subscriber draws a design fault from the B section to design the inventory modelistyessae. The subject follows the Kuivaketju10 procedure (www.kuivaketju10.fi) and the Healthy House Criterion Information, where applicable (the Criteria Assistance may be more detailed in the Planning Initial Meeting), which specifies the requirements for the design of graft materials. The assignment includes participation in the preparation of the moisture management plan in accordance with the Dry Chain10 procedure. Project New Building tInitially assumed as a collaborative project management contract and a B-wing upgrade as a shared or total contract. quotation material with attachments.
Internet address (URL): http://www.mestaritoiminta.fi
Documents
Tender Notice