CENTRAL HIGHLANDS REGIONAL COUNCIL has floated a tender for Blackwater Water Treatment Plant Filter to Waste; Blackwater Wastewater Treatment Plant Valve Replacements; Emerald Magnetic Flow Meter Replacements. The project location is Australia and the tender is closing on 17 Feb 2020. The tender notice number is CHRC009577, while the TOT Ref Number is 40016201. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Australia

Summary : Blackwater Water Treatment Plant Filter to Waste; Blackwater Wastewater Treatment Plant Valve Replacements; Emerald Magnetic Flow Meter Replacements

Deadline : 17 Feb 2020

Other Information

Notice Type : Tender

TOT Ref.No.: 40016201

Document Ref. No. : CHRC009577

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : CENTRAL HIGHLANDS REGIONAL COUNCIL
Brian Duffy
Robyn Letts

Australia

Tender Details

Tender are invited for Blackwater Water Treatment Plant Filter to Waste; Blackwater Wastewater Treatment Plant Valve Replacements; Emerald Magnetic Flow Meter Replacements

Region(s) : Central Queensland

Opening Date : 24 January 2020 01:00 PM

Closing Date : 17 February 2020 02:00 PM

Category : Pipe piping and pipe fittings - (25%)Valves - (25%)Water and wastewater treatment supply and disposal - (25%)Water and sewer utilities - (25%)

Tender State : Open

Description : This Contract includes the upgrade of the filter backwash sequence at the Blackwater Water Treatment Plant (WTP), minor piping works and valve replacements at the Blackwater Wastewater Treatment Plant (WWTP), and replacement of two magnetic flow meters in Emerald.In its current state, the Blackwater WTP has 6 filters. Filters 1 to 4 have the option to perform a filter to waste post backwash, while filters 5 and 6 do not have this filter to waste option. This can result in filters 1 to 4 being overloaded which increases the risk of turbidity breakthrough and reduction in treated water quality.A Concept Solutions Report was produced by Q Consult in July 2019. The purpose of this Contract is to undertake the detailed design and construction of the recommended option found in that report: to turn a section of the above ground backwash header into a combined backwash header / filter to waste header for filters 5 and 6. The works will include modifications to the above ground pipework and the installation of a short section of in-ground pipework connecting to the existing in-ground pipework. The works are multidisciplinary and will include hydraulic, process, mechanical, electrical/control systems and civil.

Documents

 Tender Notice