Advanced Metering Infrastructure Service Provider (AMISP) for Smart Metering on Design-Build... Tender

KFW DEVELOPMENT BANK has floated a tender for Advanced Metering Infrastructure Service Provider (AMISP) for Smart Metering on Design-Build Finance-Own-Operate-Transfer (DBFOOT) basis on Hybrid OPEX model. The project location is , , India. The reference number is BMZ201767201 and it is closing on 25 Apr 2022. Suppliers can request Register free of cost to get the complete Tender details and download the document.

Expired Tender

Procurement Summary

State : -

Summary : Advanced Metering Infrastructure Service Provider (AMISP) for Smart Metering on Design-Build Finance-Own-Operate-Transfer (DBFOOT) basis on Hybrid OPEX model

Deadline : 25 Apr 2022

Other Information

Notice Type : Tender

TOT Ref.No.: 64839267

Document Ref. No. : BMZ201767201

Competition : ICB

Financier : KFW Bankengruppe (German Development Bank)

Purchaser Ownership : Public

Document Fees : Refer Document

Tender Value : Refer Document

EMD : Refer Document

Purchaser's Detail

Purchaser : KFW DEVELOPMENT BANK
Director KfW Office: Dr. Christoph Kessler 46, Paschimi Marg Vasant Vihar 110057 New Delhi Phone: +91 11 4253 4253 Fax: +91 11 2615 5267
Country: India
Email: kfw.newdelhi@kfw.de

Tender Details

Tenders are invited for Advanced Metering Infrastructure Service Provider (AMISP) for Smart Metering on Design-Build Finance-Own-Operate-Transfer (DBFOOT) basis on Hybrid OPEX model in MPPoKVVCL, MP. The CGM (Procurement) on behalf of the Madhya Pradesh Poorv Kshetra Vidyut Vitran Co. Ltd. hereinafter referred to as “MPPoKVVCL” invites tender for the selection and appointment of Advanced Metering Infrastructure (“AMI”) Service Provider (“AMISP”) for Smart Metering on Design Build Finance Own Operate Transfer (DBFOOT) basis. Utility intends to appoint a “Advance Metering Infrastructure Service Provider (AMISP)” or the “AMISP” for Design-Build-Finance-Own-Operate-Transfer (DBFOOT) the Advance Metering Infrastructure (AMI) Project in the post-paid mode (with provision of pre-paid) in selected area(s) of operation. AMISP shall be responsible to finance and implement the entire project. The AMISP shall also be responsible for its operations of all meters and related infrastructure after Operational Go-Live of the AMI system. Utility shall pay AMISP Service Charge on a monthly basis to AMISP in accordance with the terms and conditions of the AMISP Contract. AMISP shall transfer the ownership of the entire system including all the hardware, software along with its valid licenses, and any data collected during the Project to the Utility at the end of the Contract Period to facilitate seamless operation of Utility businesses. Deadline: Apr 25, 2022.

Documents

 Tender Notice


Gem Services Registration Consultant