Login
Register
Complete Your Profile
Change Password
Request a Password Reset
Download Documents
Home » Blog » Power and Energy
10 Jul 2014| Posted by Morris | In Power and Energy
Voestalpine Grobblech has acquired a further major contract in Brazil, after a planning and arbitration process lasting more than two years.
The Rota-3 project will set up a deep-ocean pipeline near Rio de Janeiro at depths of up to 2,500 metres beneath sea level.
Voestalpine will deliver sour-gas-resistant, highly durable linepipe plates between September 2014 and March 2015.
Rota-3 is a 380-kilometre pipeline linking the natural gas and oil field in the Santos basin, just off the coast of Rio de Janeiro, with the Comberj refinery.
At 132,000 tons, the 2012 forerunner project, Cabiunas, was the largest linepipe steel order in Voestalpine’s history.
Get Access to 1 Million Global Tenders